← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord 6321167
    Speed Mine · 4605437

    103(i) · 4.0 on-site hours reported

  2. Escapeways; bituminous and lignite mines.

    violationRecord 5081892
    Calvary No 81 · 1512753

    30 CFR 75.380(d)(7) · $151.00 proposed penalty

  3. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5084427
    Combs Branch Job · 1516883

    30 CFR 77.1606(c) · $151.00 proposed penalty

  4. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5084426
    Combs Branch Job · 1516883

    30 CFR 77.1606(c) · $151.00 proposed penalty

  5. Drill dust control at surface mines and surface areas of underground mines.

    violationRecord 5084425
    Combs Branch Job · 1516883

    30 CFR 72.620 · $151.00 proposed penalty

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5023580
    NORTH EAGLE MINE · 4608759

    30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty

  7. Cable fittings; suitability.

    violationRecord 5023579
    NORTH EAGLE MINE · 4608759

    30 CFR 75.515 · $151.00 proposed penalty

  8. Cable fittings; suitability.

    violationRecord 5023578
    NORTH EAGLE MINE · 4608759

    30 CFR 75.515 · $151.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5026316
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5026315
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  11. Preshift examination at fixed intervals.

    violationRecord 5026314
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.360(g) · $151.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5025198
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5025884
    Winchester 2 · 4609615

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F007456
    Calvary No 81 · 1512753

    353.8 on-site hours reported

  15. Spot Inspections

    inspectionRecord F00BE61
    NORTH EAGLE MINE · 4608759

    103(i) · 6.5 on-site hours reported

  16. Spot Inspections

    inspectionRecord F006736
    Winchester Peerless Rachel Mine · 4609258

    103(i) · 7.0 on-site hours reported

  17. Quarterly sampling; mechanized mining units.

    violationRecord 5025196
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 70.208(a)(2) · $697.00 proposed penalty

  18. Quarterly sampling; mechanized mining units.

    violationRecord 5025195
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 70.208(a)(2) · $697.00 proposed penalty

  19. Quarterly sampling; mechanized mining units.

    violationRecord 5025194
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 70.208(a)(2) · $697.00 proposed penalty

  20. Electric equipment; examination, testing and maintenance.

    violationRecord 5090030
    Speed Mine · 4605437

    30 CFR 75.512 · $818.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5090029
    Speed Mine · 4605437

    30 CFR 75.400 · $755.00 proposed penalty

  22. Electric equipment; frequency of examination and testing.

    violationRecord 5025775
    Samples Surface Mine · 4607178

    30 CFR 77.502-2 · $151.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5026313
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 5020401
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · $151.00 proposed penalty

  25. Ventilation controls.

    violationRecord 5020400
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.333(h) · $209.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.