Sev.en Global Investments a.s. safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
Speed Mine · 4605437103(i) · 4.0 on-site hours reported
Escapeways; bituminous and lignite mines.
Calvary No 81 · 151275330 CFR 75.380(d)(7) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Combs Branch Job · 151688330 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Combs Branch Job · 151688330 CFR 77.1606(c) · $151.00 proposed penalty
Drill dust control at surface mines and surface areas of underground mines.
Combs Branch Job · 151688330 CFR 72.620 · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
NORTH EAGLE MINE · 460875930 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Cable fittings; suitability.
NORTH EAGLE MINE · 460875930 CFR 75.515 · $151.00 proposed penalty
Cable fittings; suitability.
NORTH EAGLE MINE · 460875930 CFR 75.515 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester Peerless Rachel Mine · 460925830 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Preshift examination at fixed intervals.
Winchester Peerless Rachel Mine · 460925830 CFR 75.360(g) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Blue Creek No. 1 UG Mine · 460929730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester 2 · 460961530 CFR 75.370(a)(1) · $642.00 proposed penalty
Regular Safety and Health Inspection
Calvary No 81 · 1512753353.8 on-site hours reported
Spot Inspections
NORTH EAGLE MINE · 4608759103(i) · 6.5 on-site hours reported
Spot Inspections
Winchester Peerless Rachel Mine · 4609258103(i) · 7.0 on-site hours reported
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $697.00 proposed penalty
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $697.00 proposed penalty
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $697.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Speed Mine · 460543730 CFR 75.512 · $818.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $755.00 proposed penalty
Electric equipment; frequency of examination and testing.
Samples Surface Mine · 460717830 CFR 77.502-2 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Winchester Peerless Rachel Mine · 460925830 CFR 75.370(a)(1) · $336.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester Peerless Rachel Mine · 460925830 CFR 75.202(a) · $151.00 proposed penalty
Ventilation controls.
Winchester Peerless Rachel Mine · 460925830 CFR 75.333(h) · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.