← Sev.en Global Investments a.s.

Sev.en Global Investments a.s. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Electric equipment; frequency of examination and testing.

    violationRecord 5025775
    Samples Surface Mine · 4607178

    30 CFR 77.502-2 · $151.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5026313
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5020401
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.202(a) · $151.00 proposed penalty

  4. Ventilation controls.

    violationRecord 5020400
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.333(h) · $209.00 proposed penalty

  5. Roof control plan.

    violationRecord 5020399
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 75.220(a)(1) · $165.00 proposed penalty

  6. Quarterly sampling; mechanized mining units.

    violationRecord 5025197
    Winchester 2 · 4609615

    30 CFR 70.208(a)(2) · $151.00 proposed penalty

  7. Quantity and location of firefighting equipment.

    violationRecord 5084231
    BEAR BRANCH 2 · 1518565

    30 CFR 75.1100-2(a)(1) · $226.00 proposed penalty

  8. Quarterly sampling; mechanized mining units.

    violationRecord 5025192
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 70.208(a)(2) · $697.00 proposed penalty

  9. Quarterly sampling; mechanized mining units.

    violationRecord 5025191
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 70.208(a)(2) · $697.00 proposed penalty

  10. Quarterly sampling; mechanized mining units.

    violationRecord 5025190
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 70.208(a)(2) · $697.00 proposed penalty

  11. Travelways at surface installations.

    violationRecord 5025953
    WELLS PREP PLANT AND LOADOUT · 4605295

    30 CFR 77.205(a) · $151.00 proposed penalty

  12. Power wires and cables; insulation and protection.

    violationRecord 5090028
    Speed Mine · 4605437

    30 CFR 75.517 · Significant and substantial (S&S) · $27,603.00 proposed penalty

  13. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5028684
    Speed Mine · 4605437

    30 CFR 75.1107-9(a)(1) · $209.00 proposed penalty

  14. Electric wiring and equipment; installation and maintenance.

    violationRecord 5028244
    Rocklick Preparation Plant · 4606448

    30 CFR 77.516 · $1,126.00 proposed penalty

  15. Travelways at surface installations.

    violationRecord 5028243
    Rocklick Preparation Plant · 4606448

    30 CFR 77.205(b) · Significant and substantial (S&S) · $7,084.00 proposed penalty

  16. Ground control; inspection and maintenance; general.

    violationRecord 5025774
    Samples Surface Mine · 4607178

    30 CFR 77.1004(b) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  17. Loading and haulage equipment; installations.

    violationRecord 5025773
    Samples Surface Mine · 4607178

    30 CFR 77.1605(d) · $432.00 proposed penalty

  18. Certification.

    violationRecord 5023577
    NORTH EAGLE MINE · 4608759

    30 CFR 75.1201 · $151.00 proposed penalty

  19. Mechanical equipment guards.

    violationRecord 5020398
    Winchester Peerless Rachel Mine · 4609258

    30 CFR 77.400(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  20. Quarterly sampling; mechanized mining units.

    violationRecord 5025189
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 70.208(a)(2) · $151.00 proposed penalty

  21. Quarterly sampling; mechanized mining units.

    violationRecord 5025188
    Blue Creek No. 1 UG Mine · 4609297

    30 CFR 70.208(a)(2) · $151.00 proposed penalty

  22. Power wires and cables; insulation and protection.

    violationRecord 5025883
    Winchester 2 · 4609615

    30 CFR 75.517 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5025882
    Winchester 2 · 4609615

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  24. Quarterly sampling; mechanized mining units.

    violationRecord 5025193
    Winchester 2 · 4609615

    30 CFR 70.208(a)(2) · $151.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord F0115E6
    NO. 77 · 1509636

    269.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.