Sean M Gallivan safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
ROUTE 81, LLC · 30022557.8 on-site hours reported
Brakes.
ROUTE 81, LLC · 300225530 CFR 56.14101(a)(2) · $165.00 proposed penalty
Moving machine parts.
ROUTE 81, LLC · 300225530 CFR 56.14107(a) · $151.00 proposed penalty
Construction and maintenance of guards.
ROUTE 81, LLC · 300225530 CFR 56.14112(b) · $245.00 proposed penalty
Handrails and toeboards.
ROUTE 81, LLC · 300225530 CFR 56.11002 · $245.00 proposed penalty
Safe access.
ROUTE 81, LLC · 300225530 CFR 56.11001 · $151.00 proposed penalty
Horns and backup alarms.
ROUTE 81, LLC · 300225530 CFR 56.14132(a) · $245.00 proposed penalty
Moving machine parts.
ROUTE 81, LLC · 300225530 CFR 56.14107(a) · $151.00 proposed penalty
Procedures during repairs or maintenance.
ROUTE 81, LLC · 300225530 CFR 56.14105 · $151.00 proposed penalty
Regular Safety and Health Inspection
METSO LT1213S (CR8) · 30041878.0 on-site hours reported
Regular Safety and Health Inspection
Eagle 1200 Plant · 30040087.3 on-site hours reported
Verbal Hazard Complaint Inspections
ROUTE 81, LLC · 30022554.0 on-site hours reported
Spot Inspection
ROUTE 81, LLC · 30022551.8 on-site hours reported
Records of training.
ROUTE 81, LLC · 300225530 CFR 46.9(c)(2)(i) · $151.00 proposed penalty
Inspection and cover plates.
ROUTE 81, LLC · 300225530 CFR 56.12032 · $151.00 proposed penalty
Electrical conductors.
ROUTE 81, LLC · 300225530 CFR 56.12004 · $151.00 proposed penalty
Temporary, portable containers.
ROUTE 81, LLC · 300225530 CFR 47.44(b) · $151.00 proposed penalty
Barricades and warning signs.
ROUTE 81, LLC · 300225530 CFR 56.20011 · $151.00 proposed penalty
Inspection.
ROUTE 81, LLC · 300225530 CFR 56.4201(a)(1) · $151.00 proposed penalty
Moving machine parts.
ROUTE 81, LLC · 300225530 CFR 56.14107(a) · $151.00 proposed penalty
Moving machine parts.
ROUTE 81, LLC · 300225530 CFR 56.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
ROUTE 81, LLC · 300225520.0 on-site hours reported
Insulation and fittings for power wires and cables.
ROUTE 81, LLC · 300225530 CFR 56.12008 · $193.00 proposed penalty
Construction and maintenance of guards.
ROUTE 81, LLC · 300225530 CFR 56.14112(b) · $151.00 proposed penalty
Construction and maintenance of guards.
ROUTE 81, LLC · 300225530 CFR 56.14112(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.