Scott Mueller; Brad Fancher; Martin Mueller safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
General requirements.
Green/Croissant · 050475330 CFR 57.4200(b)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
Green/Croissant · 05047536.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
LOVELAND READY-MIX CONCRETE INC SAND AND · 050100430 CFR 50.30(a) · $151.00 proposed penalty
Moving machine parts.
LOVELAND READY-MIX CONCRETE INC SAND AND · 050100430 CFR 56.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
LOVELAND READY-MIX CONCRETE INC SAND AND · 05010045.5 on-site hours reported
Records of training.
Knox Pit · 050516930 CFR 46.9(b)(5) · $151.00 proposed penalty
Berms or guardrails.
Knox Pit · 050516930 CFR 56.9300(b) · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
Knox Pit · 05051696.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Knox Pit · 050516930 CFR 50.30(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Knox Pit · 05051695.5 on-site hours reported
Insulation and fittings for power wires and cables.
LOVELAND READY-MIX CONCRETE INC SAND AND · 050100430 CFR 56.12008 · $151.00 proposed penalty
Regular Safety and Health Inspection
LOVELAND READY-MIX CONCRETE INC SAND AND · 05010046.0 on-site hours reported
Regular Safety and Health Inspection
Green/Croissant · 05047535.0 on-site hours reported
Horns and backup alarms.
Green/Croissant · 050475330 CFR 56.14132(a) · $151.00 proposed penalty
Spot Inspection
LOVELAND READY-MIX CONCRETE INC SAND AND · 05010049.0 on-site hours reported
Regular Safety and Health Inspection
LOVELAND READY-MIX CONCRETE INC SAND AND · 05010045.0 on-site hours reported
Combustible waste.
LOVELAND READY-MIX CONCRETE INC SAND AND · 050100430 CFR 56.4104(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Green/Croissant · 05047534.0 on-site hours reported
Requirement for container labels.
Green/Croissant · 050475330 CFR 47.41(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Green/Croissant · 050475330 CFR 56.14112(a)(1) · $151.00 proposed penalty
Spillage and leakage.
Knox Pit · 050516930 CFR 56.4102 · $151.00 proposed penalty
Regular Safety and Health Inspection
Knox Pit · 05051696.3 on-site hours reported
Spot Inspection
Green/Croissant · 05047530.0 on-site hours reported
Spot Inspection
Knox Pit · 05051690.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Green/Croissant · 050475330 CFR 50.30(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.