Ruben Garibay safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Compliance Follow-up Inspection
SQMC 2 · 41055972.0 on-site hours reported
Brakes.
SQMC 2 · 410559730 CFR 56.14101(a)(2) · $193.00 proposed penalty
Safety defects; examination, correction and records.
SQMC 2 · 410559730 CFR 56.14100(b) · $193.00 proposed penalty
Operators stations.
SQMC 2 · 410559730 CFR 56.14103(b) · $193.00 proposed penalty
Warning signs.
SQMC 2 · 410559730 CFR 56.4101 · $193.00 proposed penalty
Operators stations.
SQMC 2 · 410559730 CFR 56.14103(c)(2) · $193.00 proposed penalty
Housekeeping.
SQMC 2 · 410559730 CFR 56.20003(a) · $193.00 proposed penalty
General requirements.
SQMC 2 · 410559730 CFR 56.4200(b)(2) · $193.00 proposed penalty
Storage of hazardous materials.
SQMC 2 · 410559730 CFR 56.16003 · $193.00 proposed penalty
Safe access.
SQMC 2 · 410559730 CFR 56.11001 · $193.00 proposed penalty
Safety defects; examination, correction and records.
SQMC 2 · 410559730 CFR 56.14100(a) · $193.00 proposed penalty
Safety defects; examination, correction and records.
SQMC 2 · 410559730 CFR 56.14100(b) · $288.00 proposed penalty
Berms or guardrails.
SQMC 2 · 410559730 CFR 56.9300(a) · $193.00 proposed penalty
Work on electrically-powered equipment.
SQMC 2 · 410559730 CFR 56.12016 · $193.00 proposed penalty
Identification of power switches.
SQMC 2 · 410559730 CFR 56.12018 · $288.00 proposed penalty
Moving machine parts.
SQMC 2 · 410559730 CFR 56.14107(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Safety can use.
SQMC 2 · 410559730 CFR 56.4402 · $193.00 proposed penalty
Spillage and leakage.
SQMC 2 · 410559730 CFR 56.4102 · $193.00 proposed penalty
Regular Safety and Health Inspection
SQMC 2 · 41055979.8 on-site hours reported
Regular Safety and Health Inspection
SQMC 2 · 41055979.3 on-site hours reported
Safety can use.
SQMC 2 · 410559730 CFR 56.4402 · $288.00 proposed penalty
Safety defects; examination, correction and records.
SQMC 2 · 410559730 CFR 56.14100(a) · $642.00 proposed penalty
Safety defects; examination, correction and records.
SQMC 2 · 410559730 CFR 56.14100(b) · $193.00 proposed penalty
Safety belts and lines.
SQMC 2 · 410559730 CFR 56.15005 · Significant and substantial (S&S) · $959.00 proposed penalty
Safety defects; examination, correction and records.
SQMC 2 · 410559730 CFR 56.14100(b) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.