← Ronald Norman

Ronald Norman safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5103098
    Extreme 30 · 0203476

    30 CFR 50.30(a) · $151.00 proposed penalty

  2. Regular Safety and Health Inspection

    inspectionRecord F023EEE
    Extreme 30 · 0203476

    3.3 on-site hours reported

  3. Insulation and fittings for power wires and cables.

    violationRecord 5103097
    Extreme 30 · 0203476

    30 CFR 56.12008 · $165.00 proposed penalty

  4. Inspection and cover plates.

    violationRecord 5103096
    Extreme 30 · 0203476

    30 CFR 56.12032 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  5. Construction and maintenance of guards.

    violationRecord 5103095
    Extreme 30 · 0203476

    30 CFR 56.14112(b) · $245.00 proposed penalty

  6. Dump site restraints.

    violationRecord 5103094
    Extreme 30 · 0203476

    30 CFR 56.9301 · $165.00 proposed penalty

  7. Compliance Follow-up Inspection

    inspectionRecord F01DAC1
    Extreme 30 · 0203476

    1.5 on-site hours reported

  8. Training plans.

    violationRecord 9686965
    Extreme 30 · 0203476

    30 CFR 46.3(i) · $151.00 proposed penalty

  9. Requirement for a HazCom program.

    violationRecord 9686964
    Extreme 30 · 0203476

    30 CFR 47.31(a) · $151.00 proposed penalty

  10. First aid.

    violationRecord 9686963
    Extreme 30 · 0203476

    30 CFR 56.18010 · $151.00 proposed penalty

  11. Testing grounding systems.

    violationRecord 9686962
    Extreme 30 · 0203476

    30 CFR 56.12028 · Significant and substantial (S&S) · $366.00 proposed penalty

  12. Examination of working places.

    violationRecord 9686961
    Extreme 30 · 0203476

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $366.00 proposed penalty

  13. Grounding circuit enclosures.

    violationRecord 9686960
    Extreme 30 · 0203476

    30 CFR 56.12025 · Significant and substantial (S&S) · $366.00 proposed penalty

  14. Annual refresher training.

    violationRecord 9686959
    Extreme 30 · 0203476

    30 CFR 46.8(a) · Significant and substantial (S&S) · $407.00 proposed penalty

  15. Regular Safety and Health Inspection

    inspectionRecord F021E5F
    Extreme 30 · 0203476

    6.8 on-site hours reported

  16. Safety defects; examination, correction and records.

    violationRecord 9686958
    Extreme 30 · 0203476

    30 CFR 56.14100(a) · $151.00 proposed penalty

  17. Safety defects; examination, correction and records.

    violationRecord 9686957
    Extreme 30 · 0203476

    30 CFR 56.14100(b) · $151.00 proposed penalty

  18. Horns and backup alarms.

    violationRecord 9686956
    Extreme 30 · 0203476

    30 CFR 56.14132(a) · $151.00 proposed penalty

  19. Berms or guardrails.

    violationRecord 9686955
    Extreme 30 · 0203476

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  20. Berms or guardrails.

    violationRecord 9686954
    Extreme 30 · 0203476

    30 CFR 56.9300(b) · Significant and substantial (S&S) · $366.00 proposed penalty

  21. Electrical conductors.

    violationRecord 9686953
    Extreme 30 · 0203476

    30 CFR 56.12004 · $151.00 proposed penalty

  22. Moving machine parts.

    violationRecord 9686952
    Extreme 30 · 0203476

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $549.00 proposed penalty

  23. Moving machine parts.

    violationRecord 9686951
    Extreme 30 · 0203476

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  24. Mine Idle Activity

    inspectionRecord F021E5E
    Extreme 30 · 0203476

    1.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.