Ronald L Follmer safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Powerscreen Plant · 25013043.0 on-site hours reported
Eye protection when operating grinding wheels.
Powerscreen Plant · 250130430 CFR 56.15014 · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
Windmill Pit · 25012892.0 on-site hours reported
Compliance Follow-up Inspection
Alda Pit · 25011890.0 on-site hours reported
Action level.
Alda Pit · 250118930 CFR 62.120 · $151.00 proposed penalty
Testing grounding systems.
Alda Pit · 250118930 CFR 56.12028 · $151.00 proposed penalty
Testing grounding systems.
Alda Pit · 250118930 CFR 56.12028 · $151.00 proposed penalty
Parking procedures for unattended equipment.
Alda Pit · 250118930 CFR 56.14207 · $151.00 proposed penalty
Moving machine parts.
Alda Pit · 250118930 CFR 56.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Alda Pit · 25011899.5 on-site hours reported
Regular Safety and Health Inspection
Newark · 25011843.5 on-site hours reported
Moving machine parts.
Newark · 250118430 CFR 56.14107(a) · $151.00 proposed penalty
Correction of dangerous conditions.
Minden Pit · 250057330 CFR 56.12030 · $151.00 proposed penalty
Regular Safety and Health Inspection
Minden Pit · 25005738.0 on-site hours reported
Regular Safety and Health Inspection
Newark · 25011846.3 on-site hours reported
Regular Safety and Health Inspection
Greystone Portable · 25013211.0 on-site hours reported
Regular Safety and Health Inspection
Minden Pit · 25005731.3 on-site hours reported
Regular Safety and Health Inspection
Powerscreen Plant · 250130410.0 on-site hours reported
First-aid materials.
Windmill Pit · 250128930 CFR 56.15001 · $151.00 proposed penalty
Regular Safety and Health Inspection
Windmill Pit · 250128910.5 on-site hours reported
Regular Safety and Health Inspection
Alda Pit · 25011896.0 on-site hours reported
Moving machine parts.
Alda Pit · 250118930 CFR 56.14107(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Minden Pit · 250057330 CFR 56.14100(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Minden Pit · 250057330 CFR 56.14100(b) · $151.00 proposed penalty
Spillage and leakage.
Minden Pit · 250057330 CFR 56.4102 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.