Regular Safety and Health Inspection
J.C. Plant · 09012063.0 on-site hours reported
Spot Inspection
Smith Farm Mine · 15199484.5 on-site hours reported
Verbal Hazard Complaint Inspections
Blount-Loudon Quarry · 40036097.0 on-site hours reported
Berms or guardrails.
Blount-Loudon Quarry · 400360930 CFR 56.9300(b) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Berms or guardrails.
Blount-Loudon Quarry · 400360930 CFR 56.9300(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Horns and backup alarms for surface equipment.
Bloomington Underground Mine · 120232230 CFR 57.14132(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
West Huntsville · 010350616.0 on-site hours reported
Regular Safety and Health Inspection
Bloomington Underground Mine · 120232232.3 on-site hours reported
Insulation and fittings for power wires and cables.
Bloomington Underground Mine · 120232230 CFR 56.12008 · $165.00 proposed penalty
Electrical conductors.
Bloomington Underground Mine · 120232230 CFR 56.12004 · $165.00 proposed penalty
Requirement for container labels.
Box Canyon Sand & Gravel · 410446530 CFR 47.41(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Oak Ridge Quarry & Mill · 400008318.5 on-site hours reported
Moving machine parts.
Boone Quarry · 151806830 CFR 57.14107(a) · Significant and substantial (S&S) · $465.00 proposed penalty
Safe access.
Boone Quarry · 151806830 CFR 57.11001 · Significant and substantial (S&S) · $465.00 proposed penalty
Inspection and cover plates.
Boone Quarry · 151806830 CFR 57.12032 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Jefferson County Stone · 151815730 CFR 57.14100(b) · $151.00 proposed penalty
Slip or fall of person
Staunton Quarry · 4400144Dys awy frm wrk & restrctd act
Accident narrative
While on ground level, the EE reached into an excavator for a hoodie, lost footing, and grabbed the handrail, injuring their left elbow. Sought treatment the same day and returned to work with restrictions that did not affect regular job duties. An 08/15/25 MRI showed a left triceps rupture requiring surgery. No equipment, compliance, training, or PPE issues were involved.
Spot Inspection
Monroe County Stone · 40031447.5 on-site hours reported
Safe access.
Boone Quarry · 151806830 CFR 57.11001 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Boone Quarry · 151806830 CFR 57.14100(b) · $151.00 proposed penalty
Safe access.
Boone Quarry · 151806830 CFR 57.11001 · $151.00 proposed penalty
Moving machine parts.
Boone Quarry · 151806830 CFR 57.14107(a) · $151.00 proposed penalty
Recordkeeping.
Jefferson County Stone · 151815730 CFR 57.19121 · $151.00 proposed penalty
Correction of hazardous conditions.
Jefferson County Stone · 151815730 CFR 57.3200 · $151.00 proposed penalty
Electrical conductors.
Monroe County Stone · 400314430 CFR 56.12004 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.