Rogers Group Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
TN River Sand & Gravel · 400081715.0 on-site hours reported
Independent contractor register.
Princeton Mine · 150001330 CFR 45.4(b) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Princeton Mine · 150001330 CFR 57.14207 · $151.00 proposed penalty
Moving machine parts.
Princeton Mine · 150001330 CFR 57.14107(a) · $151.00 proposed penalty
Surface electric substations and liquid storage facilities.
Princeton Mine · 150001330 CFR 57.4130(b) · $151.00 proposed penalty
Correction of hazardous conditions.
Jefferson County Stone · 151815730 CFR 57.3200 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Non-Fatal Accident Investigation
Jefferson County Stone · 15181579.0 on-site hours reported
Main fan maintenance.
Boone Quarry · 151806830 CFR 57.8525 · $151.00 proposed penalty
Flying or falling materials.
Boone Quarry · 151806830 CFR 57.14110 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Combustible waste.
Boone Quarry · 151806830 CFR 57.4104(b)(1) · $313.00 proposed penalty
Construction and maintenance of guards.
Rutherford Quarry · 400006130 CFR 56.14112(a)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
Greenbrier Quarry · 03008559.5 on-site hours reported
Regular Safety and Health Inspection
Rutherford Quarry · 400006131.0 on-site hours reported
Requirement for container labels.
Greenbrier Quarry · 030085530 CFR 47.41(a) · $151.00 proposed penalty
Housekeeping.
Greenbrier Quarry · 030085530 CFR 56.20003(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Hopkinsville Aggregate Quarry · 150000530 CFR 56.14100(b) · $151.00 proposed penalty
Combustible waste.
Hopkinsville Aggregate Quarry · 150000530 CFR 56.4104(b) · $151.00 proposed penalty
Fall of roof or back
Jefferson County Stone · 1518157No dys awy frm wrk,no rstr act
Accident narrative
Employee had bolted the face up tight then backed out roughly 50', was reloading bolt supplies when a piece of material fell from in between the roof bolts. It struck the cab and broke over the side striking the employee who was on foot next to the cab/engine bay checking the water level. Employee received laceration to their head and leg which were closed at the hospital ER.
Regular Safety and Health Inspection
Hopkinsville Aggregate Quarry · 150000569.5 on-site hours reported
Protection for openings around travelways.
Boone Quarry · 151806830 CFR 57.11012 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Suspended loads.
Boone Quarry · 151806830 CFR 57.16009 · $151.00 proposed penalty
Suspended loads.
Boone Quarry · 151806830 CFR 57.16009 · $151.00 proposed penalty
Examination of working places.
Boone Quarry · 151806830 CFR 57.18002(a) · $398.00 proposed penalty
Regular Safety and Health Inspection
Boone Quarry · 151806853.0 on-site hours reported
Combustible waste.
Boone Quarry · 151806830 CFR 57.4104(b)(1) · $398.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.