Robbie Palmer; Rick Palmer; Derrick Jones safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Adobe Rock -Erda Pit · 42022350.0 on-site hours reported
Electrical conductors.
Adobe Rock -Erda Pit · 420223530 CFR 56.12004
Dump site restraints.
Adobe Rock -Erda Pit · 420223530 CFR 56.9301 · Significant and substantial (S&S)
Inspection and cover plates.
Adobe Rock -Erda Pit · 420223530 CFR 56.12032
Inspection and cover plates.
Adobe Rock -Erda Pit · 420223530 CFR 56.12032
Regular Safety and Health Inspection
Adobe Rock -Erda Pit · 42022359.0 on-site hours reported
Safety defects; examination, correction and records.
Adobe Rock -Erda Pit · 420223530 CFR 56.14100(c) · $151.00 proposed penalty
Construction and maintenance of ladders.
Adobe Rock -Erda Pit · 420223530 CFR 56.11003 · Significant and substantial (S&S) · $151.00 proposed penalty
Construction and maintenance of ladders.
Adobe Rock -Erda Pit · 420223530 CFR 56.11003 · Significant and substantial (S&S) · $151.00 proposed penalty
Construction and maintenance of ladders.
Adobe Rock -Erda Pit · 420223530 CFR 56.11003 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Adobe Rock -Erda Pit · 420223530 CFR 56.12008 · $288.00 proposed penalty
Insulation and fittings for power wires and cables.
Adobe Rock -Erda Pit · 420223530 CFR 56.12008 · $151.00 proposed penalty
Barricades and warning signs.
Adobe Rock -Erda Pit · 420223530 CFR 56.20011 · $151.00 proposed penalty
Inspection and cover plates.
Adobe Rock -Erda Pit · 420223530 CFR 56.12032 · $151.00 proposed penalty
Regular Safety and Health Inspection
Adobe Rock -Erda Pit · 42022358.5 on-site hours reported
Electrical conductors.
Adobe Rock -Erda Pit · 420223530 CFR 56.12004 · $151.00 proposed penalty
Parking procedures for unattended equipment.
Adobe Rock -Erda Pit · 420223530 CFR 56.14207 · $151.00 proposed penalty
Inspection and cover plates.
Adobe Rock -Erda Pit · 420223530 CFR 56.12032 · $151.00 proposed penalty
Extinguisher recharging or replacement.
Adobe Rock -Erda Pit · 420223530 CFR 56.4203 · $151.00 proposed penalty
Regular Safety and Health Inspection
Adobe Rock -Erda Pit · 42022355.0 on-site hours reported
Inspection and cover plates.
Adobe Rock -Erda Pit · 420223530 CFR 56.12032 · $151.00 proposed penalty
Horns and backup alarms.
Adobe Rock -Erda Pit · 420223530 CFR 56.14132(b)(2) · $151.00 proposed penalty
Electrical conductors.
Adobe Rock -Erda Pit · 420223530 CFR 56.12004 · $151.00 proposed penalty
Securing gas cylinders.
Adobe Rock -Erda Pit · 420223530 CFR 56.16005 · $151.00 proposed penalty
Regular Safety and Health Inspection
Adobe Rock -Erda Pit · 42022359.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.