Impoundment Spot Inspection
Boron Operations · 04007431.5 on-site hours reported
Correction of dangerous conditions.
Boron Operations · 040074330 CFR 56.12030 · $177.00 proposed penalty
Securing gas cylinders.
Boron Operations · 040074330 CFR 56.16005 · $267.00 proposed penalty
Housekeeping.
Boron Operations · 040074330 CFR 56.20003(a) · $226.00 proposed penalty
Inspection.
Copperton Concentrator · 420199630 CFR 56.4201(a)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Copperton Concentrator · 420199630 CFR 56.14100(b) · $151.00 proposed penalty
Moving machine parts.
Boron Operations · 040074330 CFR 56.14107(a) · $398.00 proposed penalty
Stacking and storage of materials.
Boron Operations · 040074330 CFR 56.16001 · $151.00 proposed penalty
Construction and maintenance of ladders.
Boron Operations · 040074330 CFR 56.11003 · $267.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Boron Operations · 040074330 CFR 50.30(a) · $151.00 proposed penalty
Inspection and cover plates.
Boron Operations · 040074330 CFR 56.12032 · $366.00 proposed penalty
Construction and maintenance of guards.
Boron Operations · 040074330 CFR 56.14112(b) · $592.00 proposed penalty
Seat belts for haulage trucks.
Boron Operations · 040074330 CFR 56.14131(a) · $177.00 proposed penalty
Safety can use.
Boron Operations · 040074330 CFR 56.4402 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Stacking and storage of materials.
Boron Operations · 040074330 CFR 56.16001 · $267.00 proposed penalty
Abandoned electric circuits.
Copperton Concentrator · 420199630 CFR 56.4011 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Electrical conductors.
Copperton Concentrator · 420199630 CFR 56.12004 · $288.00 proposed penalty
Requirement for container labels.
Copperton Concentrator · 420199630 CFR 47.41(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Copperton Concentrator · 420199630 CFR 56.14100(b) · $165.00 proposed penalty
Requirement for container labels.
Copperton Concentrator · 420199630 CFR 47.41(a) · $165.00 proposed penalty
Electrical conductors.
Copperton Concentrator · 420199630 CFR 56.12004 · $366.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Copperton Concentrator · 420199630 CFR 56.14130(i) · $9,757.00 proposed penalty
Powered haulage
Kennecott Keystone Underground · 4201392Days restricted activity only
Accident narrative
Sandvik Scoop LH02 operator was mucking in 3250 OD25. As the scoop was moving around a corner the operator was leaning forward with their head turned to get better visibility. The scoop hit a bump causing the operator's head, above the right eye, to contact the window, the operator briefly lost consciousness.
Housekeeping.
Boron Operations · 040074330 CFR 56.20003(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Moving machine parts.
Boron Operations · 040074330 CFR 56.14107(a) · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.