Rio Tinto Group safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Slip or fall of person
Bingham Canyon Mine · 4200149Days away from work only
Accident narrative
IP entered the connex at code 80 fuel island with an oil sample in their hand when they caught the corner of a rubber mat with their foot, which caused the mat to lift up with their foot causing them to trip and fall, landing on their right shoulder.
103 (g) Written Notification Hazard Complaint Inspectio
Bingham Canyon Mine · 42001490.0 on-site hours reported
Inspection and cover plates.
Boron Operations · 040074330 CFR 56.12032
Examination of working places.
Boron Operations · 040074330 CFR 56.18002(b)
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Boron Operations · 040074330 CFR 50.30(a)
Housekeeping.
Boron Operations · 040074330 CFR 56.20003(c)
Stacking and storage of materials.
Boron Operations · 040074330 CFR 56.16001
Testing grounding systems.
Boron Operations · 040074330 CFR 56.12028
Moving machine parts.
Boron Operations · 040074330 CFR 56.14107(a) · Significant and substantial (S&S)
Insulation and fittings for power wires and cables.
Boron Operations · 040074330 CFR 56.12008 · Significant and substantial (S&S)
Safety defects; examination, correction and records.
Boron Operations · 040074330 CFR 56.14100(b)
Identification of power switches.
Boron Operations · 040074330 CFR 56.12018
Impoundment Spot Inspection
Copperton Concentrator · 42019960.0 on-site hours reported
High-pressure hose connections.
Boron Operations · 040074330 CFR 56.13021
Stacking and storage of materials.
Boron Operations · 040074330 CFR 56.16001
Protection for openings around travelways.
Boron Operations · 040074330 CFR 56.11012 · Significant and substantial (S&S)
Brakes.
Boron Operations · 040074330 CFR 56.14101(a)(3)
Horns and backup alarms.
Boron Operations · 040074330 CFR 56.14132(b)(1)(i) · Significant and substantial (S&S)
Electric substations and liquid storage facilities.
Boron Operations · 040074330 CFR 56.4130(a)(3)
Horns and backup alarms.
Boron Operations · 040074330 CFR 56.14132(a)
Safety defects; examination, correction and records.
Boron Operations · 040074330 CFR 56.14100(b)
Impoundment Spot Inspection
Boron Operations · 04007432.5 on-site hours reported
Electrical conductors.
Boron Operations · 040074330 CFR 56.12004
Construction and maintenance of guards.
Boron Operations · 040074330 CFR 56.14112(a)(1)
Stacking and storage of materials.
Boron Operations · 040074330 CFR 56.16001
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.