Ricky D Kirk; Jerry Wells Jr safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
HOPEDALE MINE · 330096830 CFR 75.1731(a) · $151.00 proposed penalty
Criteria—Belt conveyors.
HOPEDALE MINE · 330096830 CFR 75.1403-5(j) · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
HOPEDALE MINE · 330096830 CFR 75.370(a)(1) · $209.00 proposed penalty
Preshift examination at fixed intervals.
HOPEDALE MINE · 330096830 CFR 75.360(f) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
HOPEDALE MINE · 330096830 CFR 72.630(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
HOPEDALE MINE · 330096830 CFR 75.370(a)(1) · $313.00 proposed penalty
Machinery and equipment; operation and maintenance.
HOPEDALE MINE · 330096830 CFR 75.1725(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
HOPEDALE MINE · 330096830 CFR 75.1731(a) · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
HOPEDALE MINE · 330096830 CFR 75.1731(b) · $193.00 proposed penalty
Ventilation Technical Investigation
HOPEDALE MINE · 330096835.0 on-site hours reported
Spot Inspections
HOPEDALE MINE · 3300968103(i) · 6.5 on-site hours reported
Examinations.
HOPEDALE MINE · 330096830 CFR 75.1433(c) · $209.00 proposed penalty
Initial measurement.
HOPEDALE MINE · 330096830 CFR 75.1432 · $151.00 proposed penalty
Other safeguards.
HOPEDALE MINE · 330096830 CFR 75.1403 · $366.00 proposed penalty
Handling of materials
HOPEDALE MINE · 3300968Days restricted activity only
Accident narrative
EE was removing stone that had fallen on the continuous miner. EE had both hands on a stone when their right hand slipped off causing the stone to fall. Which caused the stone to strike their left hand to strike the shovel.
Spot Inspections
HOPEDALE MINE · 3300968103(i) · 9.0 on-site hours reported
Mechanical equipment guards.
HOPEDALE MINE · 330096830 CFR 75.1722(b) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
HOPEDALE MINE · 330096830 CFR 75.1100-2(e) · $151.00 proposed penalty
Accumulation of combustible materials.
HOPEDALE MINE · 330096830 CFR 75.400 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
HOPEDALE MINE · 330096830 CFR 75.1731(b) · $432.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
HOPEDALE MINE · 330096830 CFR 75.1731(a) · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
HOPEDALE MINE · 330096830 CFR 75.1731(b) · $432.00 proposed penalty
Criteria—Belt conveyors.
HOPEDALE MINE · 330096830 CFR 75.1403-5(g) · $209.00 proposed penalty
Accumulation of combustible materials.
HOPEDALE MINE · 330096830 CFR 75.400 · $313.00 proposed penalty
Handling of materials
HOPEDALE MINE · 3300968No dys awy frm wrk,no rstr act
Accident narrative
EE was putting rub rail back on the continuous miner. EE caught EE's finger between the rail and the c/m.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.