  1. Securing movable parts.

    violationRecord 9767549
    Fletcher Mine and Mill · 2300409

    30 CFR 57.14206(b) · $267.00 proposed penalty

  2. Electrical conductors.

    violationRecord 9767548
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12004 · $336.00 proposed penalty

  3. Handling of misfires.

    violationRecord 5040213
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6311 · $267.00 proposed penalty

  4. Nonelectric initiation systems.

    violationRecord 5040212
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6501(b)(2) · $267.00 proposed penalty

  5. Requirement for container labels.

    violationRecord 5040211
    Fletcher Mine and Mill · 2300409

    30 CFR 47.41(a) · $151.00 proposed penalty

  6. Correction of hazardous conditions.

    violationRecord 5040210
    Fletcher Mine and Mill · 2300409

    30 CFR 57.3200 · $267.00 proposed penalty

  7. Correction of hazardous conditions.

    violationRecord 5040209
    Fletcher Mine and Mill · 2300409

    30 CFR 57.3200 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  8. Correction of dangerous conditions.

    violationRecord 5040208
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12030 · $592.00 proposed penalty

  9. Guarding electrical connections and resistor grids.

    violationRecord 9768316
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12023 · $151.00 proposed penalty

  10. Inspection.

    violationRecord 9763585
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.4201(a)(2) · $151.00 proposed penalty

  11. Insulation and fittings for power wires and cables.

    violationRecord 9763584
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12008 · $432.00 proposed penalty

  12. Areas around explosive material storage facilities.

    violationRecord 9763583
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.6101(b) · $432.00 proposed penalty

  13. Impoundment Spot Inspection

    inspectionRecord 7102500
    Viburnum #29 Mine · 2300495

    6.0 on-site hours reported

  14. Electrical conductors.

    violationRecord 9767547
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12004 · $336.00 proposed penalty

  15. Safety defects; examination, correction and records.

    violationRecord 5040207
    Fletcher Mine and Mill · 2300409

    30 CFR 57.14100(b) · $336.00 proposed penalty

  16. Electrical conductors.

    violationRecord 9768530
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12004 · $432.00 proposed penalty

  17. Construction and maintenance of guards.

    violationRecord 9763582
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14112(a)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  18. Parking procedures for unattended equipment.

    violationRecord 9763581
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14207 · $151.00 proposed penalty

  19. Vehicles.

    violationRecord 9763580
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.6202(a)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  20. Temporary, portable containers.

    violationRecord 9763579
    Brushy Creek Mine/Mill · 2300499

    30 CFR 47.44(b) · $151.00 proposed penalty

  21. Procedures during repairs or maintenance.

    violationRecord 9763578
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14105 · Significant and substantial (S&S) · $2,133.00 proposed penalty

  22. Inspection.

    violationRecord 5040076
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.4201(a)(5) · $151.00 proposed penalty

  23. Spillage and leakage.

    violationRecord 5040075
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.4102 · $151.00 proposed penalty

  24. First aid materials.

    violationRecord 5040074
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.15001 · $151.00 proposed penalty

  25. Testing grounding systems.

    violationRecord 5040073
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.12028 · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.