Separation of transported explosive material.
Fletcher Mine and Mill · 230040930 CFR 57.6201(b)(2) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Escapeways and refuges.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.11050(a) · $398.00 proposed penalty
Compliance Follow-up Inspection
Sweetwater Mine/Mill · 230045813.0 on-site hours reported
Testing grounding systems.
Fletcher Mine and Mill · 230040930 CFR 57.12028 · $432.00 proposed penalty
Securing gas cylinders.
Fletcher Mine and Mill · 230040930 CFR 57.16005 · $267.00 proposed penalty
Experienced miner training.
Brushy Creek Mine/Mill · 230049930 CFR 48.6(b) · $504.00 proposed penalty
Slip or fall of person
Fletcher Mine and Mill · 2300409Days restricted activity only
Accident narrative
EMPLOYEE WAS MOVING A PUMP, SLIPPED AND TWISTED KNEE.
Other
Sweetwater Mine/Mill · 2300458Days restricted activity only
Accident narrative
EMPLOYEE WAS WALKING ACROSS MILL CONTROL ROOM WHEN EMPLOYEE FELT A POP IN LEFT CALF MUSCLE FOLLOWED BY PAIN.
Securing gas cylinders.
Brushy Creek Mine/Mill · 230049930 CFR 57.16005 · $151.00 proposed penalty
Parking procedures for unattended equipment.
Brushy Creek Mine/Mill · 230049930 CFR 57.14207 · $193.00 proposed penalty
Non-Fatal Accident Investigation
Fletcher Mine and Mill · 23004093.5 on-site hours reported
General requirements.
Fletcher Mine and Mill · 230040930 CFR 57.4200(b)(2) · $177.00 proposed penalty
Testing grounding systems.
Brushy Creek Mine/Mill · 230049930 CFR 57.12028 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Brushy Creek Mine/Mill · 230049930 CFR 57.12008 · $151.00 proposed penalty
Escape routes.
Fletcher Mine and Mill · 230040930 CFR 57.11051(a) · $151.00 proposed penalty
Vehicles.
Fletcher Mine and Mill · 230040930 CFR 57.6202(b)(1) · $504.00 proposed penalty
Correction of dangerous conditions.
Brushy Creek Mine/Mill · 230049930 CFR 57.12030 · Significant and substantial (S&S) · $755.00 proposed penalty
Testing grounding systems.
Brushy Creek Mine/Mill · 230049930 CFR 57.12028 · $151.00 proposed penalty
Electrical conductors.
Brushy Creek Mine/Mill · 230049930 CFR 57.12004 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Brushy Creek Mine/Mill · 230049930 CFR 57.14100(b) · $151.00 proposed penalty
Moving machine parts.
Brushy Creek Mine/Mill · 230049930 CFR 57.14107(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Waste receptacles.
Brushy Creek Mine/Mill · 230049930 CFR 57.20013 · $336.00 proposed penalty
Circuit overload protection.
Fletcher Mine and Mill · 230040930 CFR 57.12001 · $592.00 proposed penalty
Delivery to storage or blast site areas.
Fletcher Mine and Mill · 230040930 CFR 57.6200 · $592.00 proposed penalty
Parking procedures for unattended equipment.
Fletcher Mine and Mill · 230040930 CFR 57.14207 · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.