← Renco Group Inc

Renco Group Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inspection and cover plates.

    violationRecord 5040329
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12032 · $1,126.00 proposed penalty

  2. Safety defects; examination, correction and records.

    violationRecord 5040328
    Fletcher Mine and Mill · 2300409

    30 CFR 57.14100(c) · $592.00 proposed penalty

  3. Verbal Hazard Complaint Inspections

    inspectionRecord F00B746
    Sweetwater Mine/Mill · 2300458

    3.5 on-site hours reported

  4. Housekeeping.

    violationRecord 5040327
    Fletcher Mine and Mill · 2300409

    30 CFR 57.20003(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  5. Ventilation plan.

    violationRecord 5040326
    Fletcher Mine and Mill · 2300409

    30 CFR 57.8520(b)(9) · $151.00 proposed penalty

  6. Main facilities.

    violationRecord 5040325
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6160(b)(1) · $267.00 proposed penalty

  7. Spillage and leakage.

    violationRecord 5040324
    Fletcher Mine and Mill · 2300409

    30 CFR 57.4102 · $177.00 proposed penalty

  8. Correction of hazardous conditions.

    violationRecord 5040323
    Fletcher Mine and Mill · 2300409

    30 CFR 57.3200 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  9. Safety defects; examination, correction and records.

    violationRecord 5040322
    Fletcher Mine and Mill · 2300409

    30 CFR 57.14100(b) · $592.00 proposed penalty

  10. Combustible waste.

    violationRecord 5040321
    Fletcher Mine and Mill · 2300409

    30 CFR 57.4104(b)(1) · $209.00 proposed penalty

  11. Electrical conductors.

    violationRecord 9760531
    Viburnum #35 (Casteel Mine) · 2301800

    30 CFR 57.12004 · $151.00 proposed penalty

  12. General requirements.

    violationRecord 9760530
    Viburnum #35 (Casteel Mine) · 2301800

    30 CFR 57.4200(b)(2) · $151.00 proposed penalty

  13. Housekeeping.

    violationRecord 9760529
    Viburnum #35 (Casteel Mine) · 2301800

    30 CFR 57.20003(b) · $151.00 proposed penalty

  14. Spot Inspection

    inspectionRecord F00B745
    Sweetwater Mine/Mill · 2300458

    3.5 on-site hours reported

  15. Stationary grinding machines.

    violationRecord 9768371
    Fletcher Mine and Mill · 2300409

    30 CFR 57.14115(b) · $177.00 proposed penalty

  16. Oxygen cylinder storage.

    violationRecord 9768370
    Fletcher Mine and Mill · 2300409

    30 CFR 57.4601 · $267.00 proposed penalty

  17. Guarding electrical connections and resistor grids.

    violationRecord 9768369
    Fletcher Mine and Mill · 2300409

    30 CFR 57.12023 · $177.00 proposed penalty

  18. Inspection.

    violationRecord 9760528
    Viburnum #35 (Casteel Mine) · 2301800

    30 CFR 57.4201(a)(2) · $151.00 proposed penalty

  19. Handling of misfires.

    violationRecord 5043007
    Viburnum #35 (Casteel Mine) · 2301800

    30 CFR 57.6311(a) · $177.00 proposed penalty

  20. Circuit overload protection.

    violationRecord 5043006
    Viburnum #35 (Casteel Mine) · 2301800

    30 CFR 57.12001 · $398.00 proposed penalty

  21. Electric lamps.

    violationRecord 5040320
    Fletcher Mine and Mill · 2300409

    30 CFR 57.17010 · $2,936.00 proposed penalty

  22. Separation of transported explosive material.

    violationRecord 5040319
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6201(b)(2) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  23. Delivery to storage or blast site areas.

    violationRecord 5040318
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6200 · $267.00 proposed penalty

  24. Air receiver tanks.

    violationRecord 5040317
    Fletcher Mine and Mill · 2300409

    30 CFR 57.13011 · $177.00 proposed penalty

  25. Main facilities.

    violationRecord 5040316
    Fletcher Mine and Mill · 2300409

    30 CFR 57.6160(a)(7) · Significant and substantial (S&S) · $1,320.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.