Renco Group Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Sweetwater Mine/Mill · 2300458134.3 on-site hours reported
Non-Fatal Accident Investigation
Brushy Creek Mine/Mill · 23004990.0 on-site hours reported
Non-Fatal Accident Investigation
Brushy Creek Mine/Mill · 230049910.3 on-site hours reported
Spillage and leakage.
Sweetwater Mine/Mill · 230045830 CFR 57.4102 · $336.00 proposed penalty
Electrical conductors.
Sweetwater Mine/Mill · 230045830 CFR 57.12004 · $1,550.00 proposed penalty
Requirement for container labels.
Sweetwater Mine/Mill · 230045830 CFR 47.41(a)(1) · $336.00 proposed penalty
Inspection.
Sweetwater Mine/Mill · 230045830 CFR 57.4201(a)(1) · $336.00 proposed penalty
Immediate notification.
Brushy Creek Mine/Mill · 230049930 CFR 50.10(b) · $7,555.00 proposed penalty
Escape and evacuation plans.
Brushy Creek Mine/Mill · 230049930 CFR 57.11053(a) · $209.00 proposed penalty
Escape and evacuation plans.
Brushy Creek Mine/Mill · 230049930 CFR 57.11053(c) · $151.00 proposed penalty
Delivery to storage or blast site areas.
Fletcher Mine and Mill · 230040930 CFR 57.6200 · $592.00 proposed penalty
Vehicle repair.
Fletcher Mine and Mill · 230040930 CFR 57.6801 · $267.00 proposed penalty
Electrical conductors.
Brushy Creek Mine/Mill · 230049930 CFR 57.12004 · $398.00 proposed penalty
Testing grounding systems.
Brushy Creek Mine/Mill · 230049930 CFR 57.12028 · $151.00 proposed penalty
Inspection.
Brushy Creek Mine/Mill · 230049930 CFR 57.4201(a)(2) · $267.00 proposed penalty
Regular Safety and Health Inspection
Brushy Creek Mine/Mill · 2300499157.0 on-site hours reported
Housekeeping.
Brushy Creek Mine/Mill · 230049930 CFR 57.20003(a) · $366.00 proposed penalty
Testing grounding systems.
Brushy Creek Mine/Mill · 230049930 CFR 57.12028 · $177.00 proposed penalty
Warning signs.
Fletcher Mine and Mill · 230040930 CFR 57.4101 · $267.00 proposed penalty
Ventilation and shielding for welding.
Fletcher Mine and Mill · 230040930 CFR 57.14213(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Correction of hazardous conditions.
Fletcher Mine and Mill · 230040930 CFR 57.3200 · $177.00 proposed penalty
Safety defects; examination, correction and records.
Fletcher Mine and Mill · 230040930 CFR 57.14100(c) · $177.00 proposed penalty
Oxygen cylinder storage.
Fletcher Mine and Mill · 230040930 CFR 57.4601 · $267.00 proposed penalty
Electrical conductors.
Fletcher Mine and Mill · 230040930 CFR 57.12004 · $313.00 proposed penalty
Spillage and leakage.
Fletcher Mine and Mill · 230040930 CFR 57.4102 · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.