← Renco Group Inc

Renco Group Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Handling of materials

    accidentRecord 220261250009
    Brushy Creek Mine/Mill · 2300499

    Days away from work only

    Accident narrative

    Employee was moving the slurry pump, and the zip tie broke on discharge hose causing it to fall and the clamp hit EE's right foot.

  2. Compliance Follow-up Inspection

    inspectionRecord F01C030
    Brushy Creek Mine/Mill · 2300499

    2.3 on-site hours reported

  3. Communication with refuge chambers.

    violationRecord 5040906
    Viburnum #29 Mine · 2300495

    30 CFR 57.11054 · $151.00 proposed penalty

  4. Testing grounding systems.

    violationRecord 5040905
    Viburnum #29 Mine · 2300495

    30 CFR 57.12028 · $151.00 proposed penalty

  5. Machinery, equipment, and tools.

    violationRecord 5043785
    Brushy Creek Mine/Mill · 2300499

    30 CFR 57.14205 · Significant and substantial (S&S) · $465.00 proposed penalty

  6. Compliance Follow-up Inspection

    inspectionRecord F002B3E
    Fletcher Mine and Mill · 2300409

    10.3 on-site hours reported

  7. Housekeeping.

    violationRecord 5043572
    Buick Mine/Mill · 2300457

    30 CFR 57.20003(a) · Significant and substantial (S&S) · $642.00 proposed penalty

  8. Testing grounding systems.

    violationRecord 5043571
    Buick Mine/Mill · 2300457

    30 CFR 57.12028 · $432.00 proposed penalty

  9. Housekeeping.

    violationRecord 5043570
    Buick Mine/Mill · 2300457

    30 CFR 57.20003(a) · $151.00 proposed penalty

  10. Spillage and leakage.

    violationRecord 5043569
    Buick Mine/Mill · 2300457

    30 CFR 57.4102 · $193.00 proposed penalty

  11. Testing grounding systems.

    violationRecord 5043568
    Buick Mine/Mill · 2300457

    30 CFR 57.12028 · $432.00 proposed penalty

  12. Compliance Follow-up Inspection

    inspectionRecord F002B3D
    Sweetwater Mine/Mill · 2300458

    8.0 on-site hours reported

  13. Regular Safety and Health Inspection

    inspectionRecord F01C02F
    Viburnum #29 Mine · 2300495

    53.3 on-site hours reported

  14. Construction and maintenance of guards.

    violationRecord 5043782
    Sweetwater Mine/Mill · 2300458

    30 CFR 57.14112(a)(1) · $151.00 proposed penalty

  15. Securing movable parts.

    violationRecord 5043567
    Buick Mine/Mill · 2300457

    30 CFR 57.14206(b) · $193.00 proposed penalty

  16. Testing grounding systems.

    violationRecord 5043566
    Buick Mine/Mill · 2300457

    30 CFR 57.12028 · $432.00 proposed penalty

  17. Electrical conductors.

    violationRecord 5043565
    Buick Mine/Mill · 2300457

    30 CFR 57.12004 · $959.00 proposed penalty

  18. Housekeeping.

    violationRecord 5043564
    Buick Mine/Mill · 2300457

    30 CFR 57.20003(a) · Significant and substantial (S&S) · $642.00 proposed penalty

  19. Requirement for container labels.

    violationRecord 5043563
    Buick Mine/Mill · 2300457

    30 CFR 47.41(a) · $432.00 proposed penalty

  20. General requirements.

    violationRecord 5043562
    Buick Mine/Mill · 2300457

    30 CFR 57.4200(b)(2) · $193.00 proposed penalty

  21. Safety defects; examination, correction and records.

    violationRecord 5043561
    Buick Mine/Mill · 2300457

    30 CFR 57.14100(b) · $1,320.00 proposed penalty

  22. Safety defects; examination, correction and records.

    violationRecord 5043560
    Buick Mine/Mill · 2300457

    30 CFR 57.14100(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  23. Safety defects; examination, correction and records.

    violationRecord 5043559
    Buick Mine/Mill · 2300457

    30 CFR 57.14100(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  24. Safety defects; examination, correction and records.

    violationRecord 5043558
    Buick Mine/Mill · 2300457

    30 CFR 57.14100(b) · $398.00 proposed penalty

  25. Inspection and cover plates.

    violationRecord 5043557
    Buick Mine/Mill · 2300457

    30 CFR 57.12032 · $432.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.