Renco Group Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Correction of dangerous conditions.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.12030 · $151.00 proposed penalty
Protection of gas cylinder valves.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.16006 · $177.00 proposed penalty
Securing gas cylinders.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.16005 · $151.00 proposed penalty
Compliance Follow-up Inspection
Brushy Creek Mine/Mill · 23004995.8 on-site hours reported
Escapeways and refuges.
Fletcher Mine and Mill · 230040930 CFR 57.11050(a) · $592.00 proposed penalty
Oxygen cylinder storage.
Fletcher Mine and Mill · 230040930 CFR 57.4601 · $151.00 proposed penalty
Parking procedures for unattended equipment.
Fletcher Mine and Mill · 230040930 CFR 57.14207 · $267.00 proposed penalty
Air receiver tanks.
Fletcher Mine and Mill · 230040930 CFR 57.13011 · $267.00 proposed penalty
Control of exposure to airborne contaminants.
Brushy Creek Mine/Mill · 230049930 CFR 57.5005(b) · $177.00 proposed penalty
Slip or fall of person
Sweetwater Mine/Mill · 2300458Dys awy frm wrk & restrctd act
Accident narrative
EMPLOYEE WAS CLIMBING OFF OF A LOADER WHEN EE SLIPPED OFF OF THE CHAIN STEP, EE'S FOOT HIT THE GROUND AND EE ROLLED EE'S RIGHT ANKLE.
Handling of materials
Brushy Creek Mine/Mill · 2300499Days restricted activity only
Accident narrative
EMPLOYEES WERE DERODDING THE ROD MILL. EMPLOYEES PICKED THE ROD UP AND CHARGER BELT BROKE. EVERYONE WENT TO LET THE MILL ROD BACK DOWN WHEN THE ROD SLIPPED OUT OF EMPLOYEES HAND AND LANDED ON EE'S LEFT FOOT ABOVE EE'S STEEL TOE IN EE'S RUBBER BOOT.
Correction of hazardous conditions.
Fletcher Mine and Mill · 230040930 CFR 57.3200 · $336.00 proposed penalty
Safety defects; examination, correction and records.
Fletcher Mine and Mill · 230040930 CFR 57.14100(b) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Safety defects; examination, correction and records.
Fletcher Mine and Mill · 230040930 CFR 57.14100(b) · $592.00 proposed penalty
Warning signs.
Fletcher Mine and Mill · 230040930 CFR 57.4101 · $267.00 proposed penalty
Combustible waste.
Fletcher Mine and Mill · 230040930 CFR 57.4104(a) · $267.00 proposed penalty
Inspection.
Fletcher Mine and Mill · 230040930 CFR 57.4201(a)(2) · $267.00 proposed penalty
Inspection.
Fletcher Mine and Mill · 230040930 CFR 57.4201(a)(1) · $267.00 proposed penalty
Correction of hazardous conditions.
Fletcher Mine and Mill · 230040930 CFR 57.3200 · $336.00 proposed penalty
Inspection.
Fletcher Mine and Mill · 230040930 CFR 57.4201(a)(1) · $267.00 proposed penalty
Testing grounding systems.
Fletcher Mine and Mill · 230040930 CFR 57.12028 · $1,126.00 proposed penalty
Securing gas cylinders.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.16005 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.14100(b) · $288.00 proposed penalty
Safe access.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.11001 · $151.00 proposed penalty
Eye protection.
Viburnum #35 (Casteel Mine) · 230180030 CFR 57.15004 · Significant and substantial (S&S) · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.