Ramsey Acquisition LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Ladders; construction; installation and maintenance.
Coal Mountain Loadout · 460913530 CFR 77.206(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Surface installations; general.
Coal Mountain Loadout · 460913530 CFR 77.200 · Significant and substantial (S&S) · $245.00 proposed penalty
Regular Safety and Health Inspection
London Magnetite · 460934711.0 on-site hours reported
Slip or fall of person
Coal Mountain Loadout · 4609135Days away from work only
Accident narrative
On 3-25-26 the employee was helping remove a bell housing. The employee was standing on a cheater bar attempting to free when EE slipped. The employee reached up to grab a channel to prevent EE from falling and felt a sharp pain in EE's left shoulder. The employee continued to work when the pain didn't subside, EE sought medical attention on 4-16-26.
Loading and haulage equipment; operation.
Coal Mountain Loadout · 460913530 CFR 77.1607(bb) · $151.00 proposed penalty
Regular Safety and Health Inspection
London Magnetite · 460934711.0 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
Coal Mountain Loadout · 460913530 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain Loadout · 460913530 CFR 77.1606(c) · $151.00 proposed penalty
Travelways at surface installations.
Coal Mountain Loadout · 460913530 CFR 77.205(d) · $151.00 proposed penalty
Regular Safety and Health Inspection
Coal Mountain Loadout · 460913565.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
Coal Mountain Loadout · 46091357.0 on-site hours reported
Regular Safety and Health Inspection
London Magnetite · 460934716.8 on-site hours reported
Heat sources.
London Magnetite · 460934730 CFR 56.4500 · $151.00 proposed penalty
Protection of gas cylinder valves.
London Magnetite · 460934730 CFR 56.16006 · $151.00 proposed penalty
Inspection and cover plates.
London Magnetite · 460934730 CFR 56.12032 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain Loadout · 460913530 CFR 77.1606(c) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
Coal Mountain Loadout · 460913530 CFR 77.410(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain Loadout · 460913530 CFR 77.1606(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
Coal Mountain Loadout · 460913522.5 on-site hours reported
Travelways at surface installations.
Coal Mountain Loadout · 460913530 CFR 77.205(b) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Coal Mountain Loadout · 460913530 CFR 77.502 · Significant and substantial (S&S) · $193.00 proposed penalty
Mechanical equipment guards.
Coal Mountain Loadout · 460913530 CFR 77.400(d) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Coal Mountain Loadout · 460913530 CFR 77.404(a) · $151.00 proposed penalty
Mechanical equipment guards.
Coal Mountain Loadout · 460913530 CFR 77.400(d) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain Loadout · 460913530 CFR 77.1606(c) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.