  1. Handling of materials

    accidentRecord 220262380001
    HEARTLAND QUARRIES PIT # 2 · 4104908

    Days away from work only

    Accident narrative

    Employee was removing motor/gear box from conveyor. The motor was not properly supported and fell as EE removed the pulley from underneath.

  2. Compliance Follow-up Inspection

    inspectionRecord F03829F
    HEARTLAND QUARRIES PIT # 2 · 4104908

    0.0 on-site hours reported

  3. Examination of working places.

    violationRecord 5179416
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  4. New miner training.

    violationRecord 5179415
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 46.5(a) · Significant and substantial (S&S) · $1,590.00 proposed penalty

  5. Securing movable parts.

    violationRecord 5179414
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.14206(b) · $165.00 proposed penalty

  6. Dump site restraints.

    violationRecord 5179413
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.9301 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 5179412
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.14100(c) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  8. Inspection.

    violationRecord 5179411
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.4201(a)(1) · $245.00 proposed penalty

  9. Label contents.

    violationRecord 5179410
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 47.42(a) · $165.00 proposed penalty

  10. Controls and switches.

    violationRecord 5179409
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.12002 · $549.00 proposed penalty

  11. Inspection.

    violationRecord 5179408
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.4201(a)(2) · $245.00 proposed penalty

  12. Temporary, portable containers.

    violationRecord 5179407
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 47.44(b) · $165.00 proposed penalty

  13. Protection of gas cylinder valves.

    violationRecord 5179406
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.16006 · $165.00 proposed penalty

  14. Warning signs.

    violationRecord 5179405
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.4101 · $245.00 proposed penalty

  15. Electrical conductors.

    violationRecord 5179404
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.12004 · $165.00 proposed penalty

  16. Inspection and cover plates.

    violationRecord 5179403
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.12032 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  17. Construction and maintenance of ladders.

    violationRecord 5179402
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.11003 · $165.00 proposed penalty

  18. Inspection and cover plates.

    violationRecord 5179401
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.12032 · Significant and substantial (S&S) · $818.00 proposed penalty

  19. Inspection and cover plates.

    violationRecord 5173600
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.12032 · $549.00 proposed penalty

  20. Distribution boxes.

    violationRecord 5173599
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.12006 · $165.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F03829B
    HEARTLAND QUARRIES PIT # 2 · 4104908

    14.5 on-site hours reported

  22. Verbal Hazard Complaint Inspections

    inspectionRecord F019151
    HEARTLAND QUARRIES PIT # 2 · 4104908

    2.0 on-site hours reported

  23. Regular Safety and Health Inspection

    inspectionRecord F019150
    HEARTLAND QUARRIES PIT # 2 · 4104908

    7.5 on-site hours reported

  24. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5008653
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 50.30(a) · $151.00 proposed penalty

  25. General requirements.

    violationRecord 5008652
    HEARTLAND QUARRIES PIT # 2 · 4104908

    30 CFR 56.4200 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.