Toilet facilities.
Hannibal Underground · 230243430 CFR 57.20008(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Toilet facilities.
Hannibal Underground · 230243430 CFR 57.20008(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Waste receptacles.
Hannibal Underground · 230243430 CFR 57.20013 · $642.00 proposed penalty
Waste receptacles.
Hannibal Underground · 230243430 CFR 57.20013 · $642.00 proposed penalty
Verbal Hazard Complaint Inspections
Hannibal Underground · 23024349.8 on-site hours reported
Regular Safety and Health Inspection
Sumter Sand · 38005757.8 on-site hours reported
Protection for openings around travelways.
Davenport Plant · 130012530 CFR 56.11012 · $151.00 proposed penalty
Heat sources.
Davenport Plant · 130012530 CFR 56.4500 · $336.00 proposed penalty
Protection for openings around travelways.
Davenport Plant · 130012530 CFR 56.11012 · $151.00 proposed penalty
Safety defects; examination, correction and records.
Davenport Plant · 130012530 CFR 56.14100(a) · $336.00 proposed penalty
Safety defects; examination, correction and records.
Davenport Plant · 130012530 CFR 56.14100(c) · $336.00 proposed penalty
Warning signs.
Davenport Plant · 130012530 CFR 56.4101 · $151.00 proposed penalty
High-pressure hose connections.
Davenport Plant · 130012530 CFR 56.13021 · $151.00 proposed penalty
Smoking and use of open flames.
Davenport Plant · 130012530 CFR 56.4100(b) · $336.00 proposed penalty
Spillage and leakage.
Davenport Plant · 130012530 CFR 56.4102 · $151.00 proposed penalty
Air receiver tanks.
Davenport Plant · 130012530 CFR 56.13011 · $151.00 proposed penalty
Moving machine parts.
Davenport Plant · 130012530 CFR 56.14107(a) · $151.00 proposed penalty
Testing grounding systems.
Davenport Plant · 130012530 CFR 56.12028 · $151.00 proposed penalty
Warning signs.
Davenport Plant · 130012530 CFR 56.4101 · $151.00 proposed penalty
Requirement for container labels.
Davenport Plant · 130012530 CFR 47.41(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Davenport Plant · 130012530 CFR 56.14100(c) · $151.00 proposed penalty
Parking procedures for unattended equipment.
Davenport Plant · 130012530 CFR 56.14207 · $151.00 proposed penalty
Machinery
Martinsburg · 4600007No dys awy frm wrk,no rstr act
Accident narrative
EE was using grinder with a grinding disc. The grinder kicked back cutting EE's knuckle on EE's right hand.
Housekeeping.
Newberry Cement Plant · 080127730 CFR 56.20003(a) · $1,968.00 proposed penalty
Testing grounding systems.
Newberry Cement Plant · 080127730 CFR 56.12028 · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.