← Quikrete Holdings Inc.

Quikrete Holdings Inc. safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. General requirements.

    violationRecord 9824972
    Newberry Cement Plant · 0801277

    30 CFR 56.4200(b)(2) · $549.00 proposed penalty

  2. Safety defects; examination, correction and records.

    violationRecord 9824971
    Newberry Cement Plant · 0801277

    30 CFR 56.14100(a) · $549.00 proposed penalty

  3. Combustible waste.

    violationRecord 5062820
    Newberry Cement Plant · 0801277

    30 CFR 56.4104(a) · $549.00 proposed penalty

  4. Inspection and cover plates.

    violationRecord 5062819
    Newberry Cement Plant · 0801277

    30 CFR 56.12032 · $1,968.00 proposed penalty

  5. Protection of persons at switchgear.

    violationRecord 5062818
    Newberry Cement Plant · 0801277

    30 CFR 56.12020 · $1,818.00 proposed penalty

  6. Identification of power switches.

    violationRecord 5062817
    Newberry Cement Plant · 0801277

    30 CFR 56.12018 · $549.00 proposed penalty

  7. Regular Safety and Health Inspection

    inspectionRecord F015BC2
    HOUM2 - Altair · 4105598

    9.5 on-site hours reported

  8. Combustible waste.

    violationRecord 9824970
    Newberry Cement Plant · 0801277

    30 CFR 56.4104(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  9. Combustible waste.

    violationRecord 9824969
    Newberry Cement Plant · 0801277

    30 CFR 56.4104(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  10. Combustible waste.

    violationRecord 9824968
    Newberry Cement Plant · 0801277

    30 CFR 56.4104(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  11. Protection for openings around travelways.

    violationRecord 9824967
    Newberry Cement Plant · 0801277

    30 CFR 56.11012 · $549.00 proposed penalty

  12. Access to stationary electrical equipment or switchgear.

    violationRecord 5062816
    Newberry Cement Plant · 0801277

    30 CFR 56.12019 · $549.00 proposed penalty

  13. Housekeeping.

    violationRecord 5062815
    Newberry Cement Plant · 0801277

    30 CFR 56.20003(a) · $2,503.00 proposed penalty

  14. Berms or guardrails.

    violationRecord 5000547
    HOUM2 - Altair · 4105598

    30 CFR 56.9300(b) · Significant and substantial (S&S) · $193.00 proposed penalty

  15. New task training.

    violationRecord 5000546
    HOUM2 - Altair · 4105598

    30 CFR 46.7(a) · Significant and substantial (S&S) · $839.00 proposed penalty

  16. Construction and maintenance of guards.

    violationRecord 9882862
    Martinsburg · 4600007

    30 CFR 56.14112(b) · $818.00 proposed penalty

  17. Insulation and fittings for power wires and cables.

    violationRecord 9882861
    Martinsburg · 4600007

    30 CFR 56.12008 · $267.00 proposed penalty

  18. Construction and maintenance of guards.

    violationRecord 9882860
    Martinsburg · 4600007

    30 CFR 56.14112(a)(1) · $267.00 proposed penalty

  19. Safety defects; examination, correction and records.

    violationRecord 9882859
    Martinsburg · 4600007

    30 CFR 56.14100(b) · $267.00 proposed penalty

  20. Spillage and leakage.

    violationRecord 9882858
    Martinsburg · 4600007

    30 CFR 56.4102 · $267.00 proposed penalty

  21. Identification of power switches.

    violationRecord 9882857
    Martinsburg · 4600007

    30 CFR 56.12018 · $2,936.00 proposed penalty

  22. Moving machine parts.

    violationRecord 9879114
    Martinsburg · 4600007

    30 CFR 56.14107(a) · $398.00 proposed penalty

  23. Construction and maintenance of guards.

    violationRecord 9879113
    Martinsburg · 4600007

    30 CFR 56.14112(a) · $398.00 proposed penalty

  24. Safety defects; examination, correction and records.

    violationRecord 9824965
    Newberry Cement Plant · 0801277

    30 CFR 56.14100(a) · $177.00 proposed penalty

  25. Barricades and warning signs.

    violationRecord 9824964
    Newberry Cement Plant · 0801277

    30 CFR 56.20011 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.