Quikrete Construction Materials, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
New miner training.
Georgia Stone Spring Hill Quarry · 080140230 CFR 46.5(b) · $168.00 proposed penalty
Examination of working places.
Georgia Stone Spring Hill Quarry · 080140230 CFR 56.18002(a) · $151.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Georgia Stone Spring Hill Quarry · 080140230 CFR 56.14130(g) · Significant and substantial (S&S) · $697.00 proposed penalty
Housekeeping.
Georgia Stone Spring Hill Quarry · 080140230 CFR 56.20003(b) · Significant and substantial (S&S) · $366.00 proposed penalty
Safety defects; examination, correction and records.
Georgia Stone Spring Hill Quarry · 080140230 CFR 56.14100(b) · Significant and substantial (S&S) · $177.00 proposed penalty
Work on electrically-powered equipment.
Georgia Stone Spring Hill Quarry · 080140230 CFR 56.12016 · Significant and substantial (S&S) · $592.00 proposed penalty
Regular Safety and Health Inspection
Ocala Quarry · 08013778.0 on-site hours reported
Verbal Hazard Complaint Inspections
Georgia Stone Spring Hill Quarry · 08014028.3 on-site hours reported
General requirements.
Ocala Quarry · 080137730 CFR 56.4200(b)(2) · $151.00 proposed penalty
Requirement for container labels.
Ocala Quarry · 080137730 CFR 47.41(a) · $151.00 proposed penalty
Smoking and use of open flames.
Ocala Quarry · 080137730 CFR 56.4100(b) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Broad River · 09012254.0 on-site hours reported
Combustible waste.
Georgia Stone Spring Hill Quarry · 080140230 CFR 56.4104(a) · $151.00 proposed penalty
Examination of working places.
Georgia Stone Spring Hill Quarry · 080140230 CFR 56.18002(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Georgia Stone Spring Hill Quarry · 080140210.0 on-site hours reported
Regular Safety and Health Inspection
Broad River · 090122511.5 on-site hours reported
Regular Safety and Health Inspection
Forsyth · 09011246.0 on-site hours reported
Verbal Hazard Complaint Inspections
Forsyth · 09011241.3 on-site hours reported
Construction and maintenance of guards.
Forsyth · 090112430 CFR 56.14112(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Carnesville Quarry · 090126510.3 on-site hours reported
Construction and maintenance of guards.
Georgia Stone, Buckhorn Plant · 380071530 CFR 56.14112(b) · $151.00 proposed penalty
Electrical conductors.
Georgia Stone, Buckhorn Plant · 380071530 CFR 56.12004 · $151.00 proposed penalty
Regular Safety and Health Inspection
Georgia Stone, Buckhorn Plant · 380071527.3 on-site hours reported
Handling of materials
Forsyth · 0901124Days restricted activity only
Accident narrative
Two EEs had been tasked with relocating a portable dewatering pump due to insufficient rainfall over the past few months. The EE's were uncoupling the intake line when the hose fell, and the metal flange locking collar struck the EE's hand. The EE suffered a laceration during the event and immediately went to the clinic, where they received five stitches and restricted work duty.
Regular Safety and Health Inspection
Ocala Quarry · 080137718.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.