Prairie State Energy Campus Management Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Handtools (nonpowered)
Lively Grove Mine · 1103193Days away from work only
Accident narrative
While worker on miner, the pry bar slipped in co-workers hand causing the shear jack cylinder to slip and strike the employees fingers between the cylinder and come-along chain. This resulted in a broken right index finger.
Violation — cited standard not reported
Lively Grove Mine · 1103193$348.00 proposed penalty
Protection from falls of roof, face and ribs.
Lively Grove Mine · 110319330 CFR 75.202(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Supplemental examination.
Lively Grove Mine · 110319330 CFR 75.361(a)(1) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Methane monitors.
Lively Grove Mine · 110319330 CFR 75.342(a)(4) · $177.00 proposed penalty
Roof control plan.
Lively Grove Mine · 110319330 CFR 75.220(a)(1) · $267.00 proposed penalty
Belt air course ventilation.
Lively Grove Mine · 110319330 CFR 75.350(a)(2) · $177.00 proposed penalty
Protection from falls of roof, face and ribs.
Lively Grove Mine · 110319330 CFR 75.202(a) · $313.00 proposed penalty
Spot Inspections
Lively Grove Mine · 1103193103(i) · 8.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
Lively Grove Mine · 110319330 CFR 75.1731(c) · $177.00 proposed penalty
Protection from falls of roof, face and ribs.
Lively Grove Mine · 110319330 CFR 75.202(a) · $313.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
Lively Grove Mine · 110319330 CFR 75.363(a) · $592.00 proposed penalty
Roof control plan.
Lively Grove Mine · 110319330 CFR 75.220(a)(1) · $288.00 proposed penalty
Stationary grinding machines; protective devices.
Lively Grove Mine · 110319330 CFR 75.1723(c) · $267.00 proposed penalty
Installation of high-voltage transmission cables.
Lively Grove Mine · 110319330 CFR 75.807 · $592.00 proposed penalty
Roof control plan.
Lively Grove Mine · 110319330 CFR 75.220(a)(1) · $288.00 proposed penalty
Protection from falls of roof, face and ribs.
Lively Grove Mine · 110319330 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Spot Inspections
Lively Grove Mine · 1103193103(i) · 6.0 on-site hours reported
Mine ventilation plan; submission and approval.
Lively Grove Mine · 110319330 CFR 75.370(a)(1) · $642.00 proposed penalty
Accumulation of combustible materials.
Lively Grove Mine · 110319330 CFR 75.400 · $366.00 proposed penalty
Disorders (repeated trauma)
Lively Grove Mine · 1103193Occupatnal illness not deg 1-6
Accident narrative
Employee reports numbness and pain in hands. They continued to work until surgery.
Permissible electric face equipment; maintenance.
Lively Grove Mine · 110319330 CFR 75.503 · $288.00 proposed penalty
Handtools (nonpowered)
Lively Grove Mine · 1103193No dys awy frm wrk,no rstr act
Accident narrative
While putting the rub rail pin in with a hammer, the employee caught the edge of their hand with the hammer, which required 3 stitches.
On-shift examination.
Lively Grove Mine · 110319330 CFR 75.362(a)(2) · $959.00 proposed penalty
Weekly examination.
Lively Grove Mine · 110319330 CFR 75.364(b)(2) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.