Prairie State Energy Campus Management Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection of trailing cables.
Lively Grove Mine · 110319330 CFR 75.606 · $177.00 proposed penalty
On-shift examination.
Lively Grove Mine · 110319330 CFR 75.362(d)(1)(ii) · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
Lively Grove Mine · 110319330 CFR 75.503 · $288.00 proposed penalty
Spot Inspections
Lively Grove Mine · 1103193103(i) · 8.0 on-site hours reported
Protection of trailing cables.
Lively Grove Mine · 110319330 CFR 75.606 · $177.00 proposed penalty
Rock dusting.
Lively Grove Mine · 110319330 CFR 75.402 · $697.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lively Grove Mine · 110319330 CFR 75.512 · $193.00 proposed penalty
Accumulation of combustible materials.
Lively Grove Mine · 110319330 CFR 75.400 · $313.00 proposed penalty
Fall of roof or back
Lively Grove Mine · 1103193Accident only
Accident narrative
A roof fall was discovered at cross cut #14, 1 North 3 (Unit #3), entry #6, Survey Station 7+80.
Spot Inspections
Lively Grove Mine · 1103193103(i) · 6.0 on-site hours reported
Non-Injury Accident Investigation
Lively Grove Mine · 11031936.5 on-site hours reported
Violation — cited standard not reported
Lively Grove Mine · 1103193Accumulation of combustible materials.
Lively Grove Mine · 110319330 CFR 75.400 · $313.00 proposed penalty
Accumulation of combustible materials.
Lively Grove Mine · 110319330 CFR 75.400 · $313.00 proposed penalty
Accumulation of combustible materials.
Lively Grove Mine · 110319330 CFR 75.400 · $313.00 proposed penalty
Accumulation of combustible materials.
Lively Grove Mine · 110319330 CFR 75.400 · $313.00 proposed penalty
Permissible electric face equipment; maintenance.
Lively Grove Mine · 110319330 CFR 75.503 · $288.00 proposed penalty
Dispensing of diesel fuel.
Lively Grove Mine · 110319330 CFR 75.1905(b)(2) · $177.00 proposed penalty
Handling of materials
Lively Grove Mine · 1103193No dys awy frm wrk,no rstr act
Accident narrative
Struck in mouth by a steel for boring holes in 2x4. After finishing making a hole in 2x4, when removing steel, employee punched self in the face with steel, resulting in a chipped front tooth.
Electric equipment; examination, testing and maintenance.
Lively Grove Mine · 110319330 CFR 75.512 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Protection of trailing cables.
Lively Grove Mine · 110319330 CFR 75.606 · $177.00 proposed penalty
Permissible electric face equipment; maintenance.
Lively Grove Mine · 110319330 CFR 75.503 · $288.00 proposed penalty
Respirable dust standards.
Lively Grove Mine · 110319330 CFR 70.100(a)(2) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Mine ventilation plan; submission and approval.
Lively Grove Mine · 110319330 CFR 75.370(a)(1) · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lively Grove Mine · 110319330 CFR 75.512 · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.