← Prairie State Energy Campus Management Inc

Prairie State Energy Campus Management Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord F012597
    Lively Grove Mine · 1103193

    103(i) · 7.5 on-site hours reported

  2. Belt air course ventilation.

    violationRecord 9788482
    Lively Grove Mine · 1103193

    30 CFR 75.350(a)(2) · $592.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 9788481
    Lively Grove Mine · 1103193

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  4. Belt air course ventilation.

    violationRecord 9788480
    Lively Grove Mine · 1103193

    30 CFR 75.350(a)(2) · $177.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 9788479
    Lively Grove Mine · 1103193

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  6. Ventilation controls.

    violationRecord 5015224
    Lively Grove Mine · 1103193

    30 CFR 75.333(e)(1)(ii) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  7. Disorders (repeated trauma)

    accidentRecord 220262590028
    Lively Grove Mine · 1103193

    Occupatnal illness not deg 1-6

    Accident narrative

    Originally reported at early date, continued pain/numbness/strain. Continued to work until taken off for surgery in September 2026.

  8. Accumulation of combustible materials.

    violationRecord 9788478
    Lively Grove Mine · 1103193

    30 CFR 75.400 · $336.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9781732
    Lively Grove Mine · 1103193

    30 CFR 75.1731(a) · $177.00 proposed penalty

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 5015436
    Lively Grove Mine · 1103193

    30 CFR 75.512 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5015435
    Lively Grove Mine · 1103193

    30 CFR 75.400 · $366.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 9781731
    Lively Grove Mine · 1103193

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  13. Roof control plan.

    violationRecord 9788476
    Lively Grove Mine · 1103193

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 9788475
    Lively Grove Mine · 1103193

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5015434
    Lively Grove Mine · 1103193

    30 CFR 75.202(a) · $313.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5015433
    Lively Grove Mine · 1103193

    30 CFR 75.202(a) · $313.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F0110C5
    Lively Grove Mine · 1103193

    103(i) · 6.0 on-site hours reported

  18. Weekly examination.

    violationRecord 5015223
    Lively Grove Mine · 1103193

    30 CFR 75.364(g) · $151.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 9788474
    Lively Grove Mine · 1103193

    30 CFR 75.370(a)(1) · $465.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 9788473
    Lively Grove Mine · 1103193

    30 CFR 75.400 · $465.00 proposed penalty

  21. Electric equipment; examination, testing and maintenance.

    violationRecord 5015222
    Lively Grove Mine · 1103193

    30 CFR 75.512 · $336.00 proposed penalty

  22. Electric equipment; examination, testing and maintenance.

    violationRecord 5015221
    Lively Grove Mine · 1103193

    30 CFR 75.512 · $336.00 proposed penalty

  23. Drill dust control at underground areas of underground mines.

    violationRecord 9781730
    Lively Grove Mine · 1103193

    30 CFR 72.630(b) · $366.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 5015432
    Lively Grove Mine · 1103193

    30 CFR 75.202(a) · $398.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5015431
    Lively Grove Mine · 1103193

    30 CFR 75.202(a) · $398.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.