Petri E Koivula; David Michael Jamison safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Stripping; loose material.
Boone North No. 2 Surface Mine · 460907030 CFR 77.1001 · $151.00 proposed penalty
Highwalls, pits and spoil banks; plans.
HWM 43 · 460965030 CFR 77.1000 · Significant and substantial (S&S) · $592.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $398.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $592.00 proposed penalty
Accumulations of combustible materials.
Coal Mountain No 1 Surface · 460906230 CFR 77.1104 · $151.00 proposed penalty
Highwalls, pits and spoil banks; plans.
Coal Mountain No 1 Surface · 460906230 CFR 77.1000 · Significant and substantial (S&S) · $3,736.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $592.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $592.00 proposed penalty
Loading and haulage equipment; installations.
Coal Mountain No 1 Surface · 460906230 CFR 77.1605(a) · $366.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $697.00 proposed penalty
Sanitary toilet facilities; maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 71.501 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.502 · $151.00 proposed penalty
Powered haulage
Harry's Branch Surface Mine · 4609651Days away from work only
Accident narrative
Two employees from Lester's Steam Cleaning were steam cleaning their steam truck at the guard shack at the end of their shift. EE 2 by drivers' side door, EE 1 behind the truck at back bumper. EE 3 in a different steam truck, backed up to let traffic by coming off the hill and backed into other truck pinching EE 1 between the trucks.
Spot Inspection
Harry's Branch Surface Mine · 460965124.0 on-site hours reported
Loading and haulage; general.
Harry's Branch Surface Mine · 460965130 CFR 77.1600(b) · $151.00 proposed penalty
Ground control; inspection and maintenance; general.
Harry's Branch Surface Mine · 460965130 CFR 77.1004(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Drill dust control at surface mines and surface areas of underground mines.
Harry's Branch Surface Mine · 460965130 CFR 72.620 · $226.00 proposed penalty
Ground control; inspection and maintenance; general.
Harry's Branch Surface Mine · 460965130 CFR 77.1004(b) · Significant and substantial (S&S) · $336.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $398.00 proposed penalty
Loading and haulage equipment; installations.
Coal Mountain No 1 Surface · 460906230 CFR 77.1605(d) · Significant and substantial (S&S) · $504.00 proposed penalty
Mobile equipment; automatic warning devices.
Coal Mountain No 1 Surface · 460906230 CFR 77.410(c) · Significant and substantial (S&S) · $504.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $592.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $592.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $592.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Ned's Branch Surface Mine · 460961630 CFR 77.1606(c) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.