Petri E Koivula; David Michael Jamison safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mechanical equipment guards.
Bull Creek Prep & Refuse Disp Facility · 460894030 CFR 77.400(a) · $151.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
Bull Creek Prep & Refuse Disp Facility · 460894030 CFR 77.1713(a) · Significant and substantial (S&S) · $267.00 proposed penalty
Travelways at surface installations.
Bull Creek Prep & Refuse Disp Facility · 460894030 CFR 77.205(b) · Significant and substantial (S&S) · $267.00 proposed penalty
Machinery and equipment; operation and maintenance.
Bull Creek Prep & Refuse Disp Facility · 460894030 CFR 77.404(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Regular Safety and Health Inspection
Bull Creek Prep & Refuse Disp Facility · 460894090.0 on-site hours reported
Regular Safety and Health Inspection
HWM 43 · 46096506.0 on-site hours reported
Handling of materials
Coal Mountain No 1 Surface · 4609062Days away from work only
Accident narrative
Employee was climbing up onto equipment and pulled muscle in their left shoulder. Employee had same injury and surgery on same shoulder 8/23.
Handtools (nonpowered)
Coal Mountain No 1 Surface · 4609062No dys awy frm wrk,no rstr act
Accident narrative
IW was installing the transmission in a 988G S/N:BNH01439. Zip tie was wrapped around the male threaded hose fitting that was placed as a marker. Zip tie had to be removed for proper seating of hose fitting. When cutting the zip tie the utility knife slipped and struck them in the lower right leg below calf. They alerted the other tech of incident. IW went to ER.
Regular Safety and Health Inspection
Choctaw Mine · 010034713.0 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
Choctaw Mine · 010034730 CFR 77.1606(c) · $151.00 proposed penalty
Powered haulage
Coal Mountain No 1 Surface · 4609062Days away from work only
Accident narrative
Employee was tramming coal loader and hit a dip in the road. Employee felt pain in lower back for approx 5 mins. Employee woke up the next day with pain in lower back and hamstrings.
Non-Injury Accident Investigation
Coal Mountain No 1 Surface · 460906215.5 on-site hours reported
Violation — cited standard not reported
Coal Mountain No 1 Surface · 4609062Spot Inspection
Coal Mountain No 1 Surface · 46090622.0 on-site hours reported
Spot Inspection
Choctaw Mine · 01003471.0 on-site hours reported
Health Technical Investigation
Harry's Branch Surface Mine · 460965111.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Choctaw Mine · 010034730 CFR 50.30 · $151.00 proposed penalty
Status change reports.
Harry's Branch Surface Mine · 460965130 CFR 71.209(a) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Coal Mountain No 1 Surface · 460906230 CFR 77.1605(b) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $267.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $398.00 proposed penalty
Hoisting of materials.
Coal Mountain No 1 Surface · 460906230 CFR 77.210(a) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coal Mountain No 1 Surface · 460906230 CFR 77.1606(c) · $267.00 proposed penalty
Machinery and equipment; operation and maintenance.
Boone North No. 2 Surface Mine · 460907030 CFR 77.404(a) · Significant and substantial (S&S) · $697.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Boone North No. 2 Surface Mine · 460907030 CFR 77.1606(c) · $2,133.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.