← Peter R Dawson

Peter R Dawson safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Inspection.

    violationRecord 5008529
    Chico 2 Quarry · 4104827

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  2. Insulation and fittings for power wires and cables.

    violationRecord 5008528
    Chico 2 Quarry · 4104827

    30 CFR 56.12008 · $151.00 proposed penalty

  3. Protection of gas cylinder valves.

    violationRecord 5008527
    Chico 2 Quarry · 4104827

    30 CFR 56.16006 · $151.00 proposed penalty

  4. Storage of hazardous materials.

    violationRecord 5008526
    Chico 2 Quarry · 4104827

    30 CFR 56.16003 · $151.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F02B733
    Chico 2 Quarry · 4104827

    7.0 on-site hours reported

  6. Safe access.

    violationRecord 5008525
    Chico 2 Quarry · 4104827

    30 CFR 56.11001 · $151.00 proposed penalty

  7. Distribution boxes.

    violationRecord 5008524
    Chico 2 Quarry · 4104827

    30 CFR 56.12006 · $151.00 proposed penalty

  8. Spot Inspection

    inspectionRecord F042CE3
    Coleman Quarry · 3402246

    0.0 on-site hours reported

  9. Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.

    violationRecord 5172217
    Coleman Quarry · 3402246

    30 CFR 50.20(a) · $151.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 5003926
    Mill Creek Quarry · 3402207

    30 CFR 56.12032 · $1,126.00 proposed penalty

  11. Warning signs.

    violationRecord 5003925
    Mill Creek Quarry · 3402207

    30 CFR 56.4101 · $313.00 proposed penalty

  12. Construction and maintenance of guards.

    violationRecord 5003924
    Mill Creek Quarry · 3402207

    30 CFR 56.14112(a)(1) · $465.00 proposed penalty

  13. Regular Safety and Health Inspection

    inspectionRecord F028E10
    Mill Creek Quarry · 3402207

    16.0 on-site hours reported

  14. Safety defects; examination, correction and records.

    violationRecord 5003923
    Mill Creek Quarry · 3402207

    30 CFR 56.14100(b) · $313.00 proposed penalty

  15. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5004268
    Coleman Quarry · 3402246

    30 CFR 50.30(a) · $151.00 proposed penalty

  16. Regular Safety and Health Inspection

    inspectionRecord F0086A5
    Coleman Quarry · 3402246

    8.0 on-site hours reported

  17. Traffic control.

    violationRecord 5004267
    Coleman Quarry · 3402246

    30 CFR 56.9100 · $313.00 proposed penalty

  18. Parking procedures for unattended equipment.

    violationRecord 5004266
    Coleman Quarry · 3402246

    30 CFR 56.14207 · $151.00 proposed penalty

  19. New miner training.

    violationRecord 5004265
    Coleman Quarry · 3402246

    30 CFR 46.5 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  20. New miner training.

    violationRecord 5004264
    Coleman Quarry · 3402246

    30 CFR 46.5 · Significant and substantial (S&S) · $480.00 proposed penalty

  21. Warning signs.

    violationRecord 5004263
    Coleman Quarry · 3402246

    30 CFR 56.4101 · $151.00 proposed penalty

  22. Inspection and cover plates.

    violationRecord 5004262
    Coleman Quarry · 3402246

    30 CFR 56.12032 · Significant and substantial (S&S) · $465.00 proposed penalty

  23. Moving machine parts.

    violationRecord 5004261
    Coleman Quarry · 3402246

    30 CFR 56.14107(a) · $151.00 proposed penalty

  24. Electrical conductors.

    violationRecord 5004260
    Coleman Quarry · 3402246

    30 CFR 56.12004 · $151.00 proposed penalty

  25. Protection of gas cylinder valves.

    violationRecord 5004259
    Coleman Quarry · 3402246

    30 CFR 56.16006 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.