Peter R Dawson safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Safe access.
Chico 2 Quarry · 410482730 CFR 56.11001 · $366.00 proposed penalty
Guarding electrical connections and resistor grids.
Chico 2 Quarry · 410482730 CFR 56.12023 · $245.00 proposed penalty
Berms or guardrails.
Chico 2 Quarry · 410482730 CFR 56.9300(d) · $592.00 proposed penalty
Correction of hazardous conditions.
Chico 2 Quarry · 410482730 CFR 56.3200 · $1,219.00 proposed penalty
Machinery, equipment, and tools.
Chico 2 Quarry · 410482730 CFR 56.14205 · $245.00 proposed penalty
Examination of working places.
Mill Creek Quarry · 340220730 CFR 56.18002(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Brakes.
Mill Creek Quarry · 340220730 CFR 56.14101(a)(2) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Mill Creek Quarry · 340220730 CFR 56.14100(c) · Significant and substantial (S&S) · $151.00 proposed penalty
Dump site restraints.
Mill Creek Quarry · 340220730 CFR 56.9301 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Berms or guardrails.
Mill Creek Quarry · 340220730 CFR 56.9300(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Mill Creek Quarry · 340220730 CFR 56.14130(g) · Significant and substantial (S&S) · $959.00 proposed penalty
Regular Safety and Health Inspection
Mill Creek Quarry · 340220714.3 on-site hours reported
Moving machine parts.
Mill Creek Quarry · 340220730 CFR 56.14107(a) · $193.00 proposed penalty
Danger signs.
Mill Creek Quarry · 340220730 CFR 56.12021 · $432.00 proposed penalty
Moving machine parts.
Mill Creek Quarry · 340220730 CFR 56.14107(a) · $193.00 proposed penalty
Housekeeping.
Mill Creek Quarry · 340220730 CFR 56.20003(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Safety defects; examination, correction and records.
Mill Creek Quarry · 340220730 CFR 56.14100(b) · $151.00 proposed penalty
Safety belts and lines.
Mill Creek Quarry · 340220730 CFR 56.15005 · Significant and substantial (S&S) · $959.00 proposed penalty
Parking procedures for unattended equipment.
Coleman Quarry · 340224630 CFR 56.14207 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Newly hired experienced miner training.
Coleman Quarry · 340224630 CFR 46.6 · Significant and substantial (S&S) · $8,529.00 proposed penalty
Machinery, equipment, and tools.
Coleman Quarry · 340224630 CFR 56.14205 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Working alone.
Coleman Quarry · 340224630 CFR 56.18020 · Significant and substantial (S&S) · $90,649.00 proposed penalty
Requirement for container labels.
Mill Creek Quarry · 340220730 CFR 47.41(a) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Mill Creek Quarry · 34022076.8 on-site hours reported
General instructions for completing MSHA Form 7000-1.
Chico 1 · 410511030 CFR 50.20-1 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.