Peckham Industries Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Training plan implementation.
CATSKILL QUARRY (ICC) · 300299330 CFR 46.4(a)(1) · $151.00 proposed penalty
Changes; notification by operator.
CATSKILL QUARRY (ICC) · 300299330 CFR 41.12 · $151.00 proposed penalty
Regular Safety and Health Inspection
POCHASSIC SAND AND GRAVEL PLANT 32 · 19006617.0 on-site hours reported
Regular Safety and Health Inspection
CATSKILL QUARRY (ICC) · 300299320.8 on-site hours reported
Electrical conductors.
POCHASSIC SAND AND GRAVEL PLANT 32 · 190066130 CFR 56.12004 · $151.00 proposed penalty
Regular Safety and Health Inspection
Westfield Quarry Plant 78 · 19000148.5 on-site hours reported
Parking procedures for unattended equipment.
Westfield Quarry Plant 78 · 190001430 CFR 56.14207 · $151.00 proposed penalty
Disorders (repeated trauma)
MONGAUP VALLEY QUARRY · 3001287Occupatnal illness not deg 1-6
Accident narrative
Mild hearing threshold shift.
Regular Safety and Health Inspection
PECKHAM MATERIALS PLEASANT VALLEY QUARRY · 30000378.0 on-site hours reported
Trimming stockpile and muckpile faces.
PECKHAM MATERIALS PLEASANT VALLEY QUARRY · 300003730 CFR 56.9314 · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
CHESTERTOWN PLANT #35 · 300008010.3 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Boscawen Sand & Gravel · 270036430 CFR 50.30(a) · $151.00 proposed penalty
Inspection of compressed-air receivers and other unfired pressure vessels.
Boscawen Sand & Gravel · 270036430 CFR 56.13015(a) · $193.00 proposed penalty
Brakes.
Boscawen Sand & Gravel · 270036430 CFR 56.14101(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
Boscawen Sand & Gravel · 27003644.5 on-site hours reported
Parking procedures for unattended equipment.
GMI Sand Pit · 270051930 CFR 56.14207 · $151.00 proposed penalty
Annual refresher training.
W. E. DAILEY, SHAFTSBURY PLANT · 430009630 CFR 46.8(a)(2) · $348.00 proposed penalty
First aid.
W. E. DAILEY, SHAFTSBURY PLANT · 430009630 CFR 56.18010 · $245.00 proposed penalty
Trimming stockpile and muckpile faces.
W. E. DAILEY, SHAFTSBURY PLANT · 430009630 CFR 56.9314 · $151.00 proposed penalty
Examination of working places.
W. E. DAILEY, SHAFTSBURY PLANT · 430009630 CFR 56.18002(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
GMI Sand Pit · 27005193.5 on-site hours reported
Regular Safety and Health Inspection
W. E. DAILEY, SHAFTSBURY PLANT · 430009614.5 on-site hours reported
Regular Safety and Health Inspection
Oxford Quarry Plant 74 · 19003287.0 on-site hours reported
Regular Safety and Health Inspection
HUDSON FALLS PLANT 31 · 300010511.0 on-site hours reported
Handling of materials
CATSKILL QUARRY (ICC) · 3002993No dys awy frm wrk,no rstr act
Accident narrative
While installing emergency stop gate the gusset caught on the flange and the assembly came in contact with employee's left wrist. Originally thought to be a contusion but after MRI it was determined to be a fracture
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.