← Paul Salt

Paul Salt safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F03F976
    MANLEY BROS. · 1101016

    5.5 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F041243
    Ecleto Creek Mine · 4105411

    8.0 on-site hours reported

  3. Safety defects; examination, correction and records.

    violationRecord 5178283
    Ecleto Creek Mine · 4105411

    30 CFR 56.14100(a) · $151.00 proposed penalty

  4. Brakes.

    violationRecord 5178282
    Ecleto Creek Mine · 4105411

    30 CFR 56.14101(a)(2) · Significant and substantial (S&S) · $432.00 proposed penalty

  5. Examination of working places.

    violationRecord 5178281
    Ecleto Creek Mine · 4105411

    30 CFR 56.18002(a) · $151.00 proposed penalty

  6. Berms or guardrails.

    violationRecord 5178280
    Ecleto Creek Mine · 4105411

    30 CFR 56.9300(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  7. Blocking equipment in a raised position.

    violationRecord 5119136
    MANLEY BROS. · 1101016

    30 CFR 56.14211(b) · Significant and substantial (S&S) · $465.00 proposed penalty

  8. Moving machine parts.

    violationRecord 5118545
    MANLEY BROS. · 1101016

    30 CFR 56.14107(a) · $1,968.00 proposed penalty

  9. Moving machine parts.

    violationRecord 5118544
    MANLEY BROS. · 1101016

    30 CFR 56.14107(a) · $1,968.00 proposed penalty

  10. Moving machine parts.

    violationRecord 5119135
    MANLEY BROS. · 1101016

    30 CFR 56.14107(a) · $592.00 proposed penalty

  11. Housekeeping.

    violationRecord 5119134
    MANLEY BROS. · 1101016

    30 CFR 56.20003(a) · $151.00 proposed penalty

  12. Protection of power conductors from mobile equipment.

    violationRecord 5119133
    MANLEY BROS. · 1101016

    30 CFR 56.12005 · $151.00 proposed penalty

  13. Housekeeping.

    violationRecord 5119132
    MANLEY BROS. · 1101016

    30 CFR 56.20003(a) · $151.00 proposed penalty

  14. Electrical conductors.

    violationRecord 5119131
    MANLEY BROS. · 1101016

    30 CFR 56.12004 · $366.00 proposed penalty

  15. Inspection and cover plates.

    violationRecord 5119130
    MANLEY BROS. · 1101016

    30 CFR 56.12032 · $151.00 proposed penalty

  16. Regular Safety and Health Inspection

    inspectionRecord F03F959
    MANLEY BROS. · 1101016

    34.8 on-site hours reported

  17. Protection of gas cylinder valves.

    violationRecord 5119129
    MANLEY BROS. · 1101016

    30 CFR 56.16006 · $151.00 proposed penalty

  18. Combustible waste.

    violationRecord 5119128
    MANLEY BROS. · 1101016

    30 CFR 56.4104 · $151.00 proposed penalty

  19. Horns and backup alarms.

    violationRecord 5119121
    MANLEY BROS. · 1101016

    30 CFR 56.14132(a) · $151.00 proposed penalty

  20. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord 6936199
    Ecleto Creek Mine · 4105411

    5.0 on-site hours reported

  21. Compliance Follow-up Inspection

    inspectionRecord F02EC54
    MANLEY BROS. · 1101016

    0.0 on-site hours reported

  22. Moving machine parts.

    violationRecord 8944937
    MANLEY BROS. · 1101016

    30 CFR 56.14107(a) · $151.00 proposed penalty

  23. Electrical conductors.

    violationRecord 5118479
    MANLEY BROS. · 1101016

    30 CFR 56.12004 · $151.00 proposed penalty

  24. Moving machine parts.

    violationRecord 5118478
    MANLEY BROS. · 1101016

    30 CFR 56.14107(a) · $226.00 proposed penalty

  25. Moving machine parts.

    violationRecord 5118477
    MANLEY BROS. · 1101016

    30 CFR 56.14107(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.