Rock dusting.
GENTRY MINE #3 · 420226330 CFR 75.402 · $151.00 proposed penalty
Diesel-powered equipment intended for use in underground coal mines.
GENTRY MINE #3 · 420226330 CFR 75.1907(b)(2) · $432.00 proposed penalty
Mine ventilation plan; submission and approval.
GENTRY MINE #3 · 420226330 CFR 75.370(a)(1) · $642.00 proposed penalty
Violation — cited standard not reported
GENTRY MINE #3 · 4202263$168.00 proposed penalty
Roof control plan.
GENTRY MINE #3 · 420226330 CFR 75.220(a)(1) · $642.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
GENTRY MINE #3 · 420226330 CFR 75.601-1 · $549.00 proposed penalty
Accumulation of combustible materials.
GENTRY MINE #3 · 420226330 CFR 75.400 · $267.00 proposed penalty
Ventilation controls.
GENTRY MINE #3 · 420226330 CFR 75.333(h) · $209.00 proposed penalty
Weekly examination.
GENTRY MINE #3 · 420226330 CFR 75.364(a)(1) · $642.00 proposed penalty
Weekly examination.
GENTRY MINE #3 · 420226330 CFR 75.364(g) · $2,133.00 proposed penalty
Roof control plan.
GENTRY MINE #3 · 420226330 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Permissible electric face equipment; maintenance.
GENTRY MINE #3 · 420226330 CFR 75.503 · $193.00 proposed penalty
Machinery and equipment; operation and maintenance.
GENTRY MINE #3 · 420226330 CFR 75.1725(a) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
GENTRY MINE #3 · 420226330 CFR 75.503 · $151.00 proposed penalty
Methane monitors.
GENTRY MINE #3 · 420226330 CFR 75.342(a)(4) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
GENTRY MINE #3 · 420226330 CFR 75.512 · $151.00 proposed penalty
Multi-gas detectors.
GENTRY MINE #3 · 420226330 CFR 75.1714-7(a) · $151.00 proposed penalty
Roof control plan.
GENTRY MINE #3 · 420226330 CFR 75.220(a)(1) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
GENTRY MINE #3 · 420226330 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
GENTRY MINE #3 · 420226330 CFR 75.1731(a) · $165.00 proposed penalty
Regular Safety and Health Inspection
GENTRY MINE #3 · 4202263347.5 on-site hours reported
Accumulations of combustible materials.
GENTRY MINE #3 · 420226330 CFR 77.1104 · $151.00 proposed penalty
Accumulations of combustible materials.
GENTRY MINE #3 · 420226330 CFR 77.1104 · $151.00 proposed penalty
Accumulations of combustible materials.
GENTRY MINE #3 · 420226330 CFR 77.1104 · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
GENTRY MINE #3 · 420226330 CFR 75.1725(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.