← Paul Elden Kingston

Paul Elden Kingston safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Rock dusting.

    violationRecord 5030456
    GENTRY MINE #3 · 4202263

    30 CFR 75.402 · $151.00 proposed penalty

  2. Diesel-powered equipment intended for use in underground coal mines.

    violationRecord 5030455
    GENTRY MINE #3 · 4202263

    30 CFR 75.1907(b)(2) · $432.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5030454
    GENTRY MINE #3 · 4202263

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  4. Violation — cited standard not reported

    violationRecord 5030453
    GENTRY MINE #3 · 4202263

    $168.00 proposed penalty

  5. Roof control plan.

    violationRecord 9735285
    GENTRY MINE #3 · 4202263

    30 CFR 75.220(a)(1) · $642.00 proposed penalty

  6. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5030326
    GENTRY MINE #3 · 4202263

    30 CFR 75.601-1 · $549.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 9735284
    GENTRY MINE #3 · 4202263

    30 CFR 75.400 · $267.00 proposed penalty

  8. Ventilation controls.

    violationRecord 5030501
    GENTRY MINE #3 · 4202263

    30 CFR 75.333(h) · $209.00 proposed penalty

  9. Weekly examination.

    violationRecord 5030500
    GENTRY MINE #3 · 4202263

    30 CFR 75.364(a)(1) · $642.00 proposed penalty

  10. Weekly examination.

    violationRecord 5030499
    GENTRY MINE #3 · 4202263

    30 CFR 75.364(g) · $2,133.00 proposed penalty

  11. Roof control plan.

    violationRecord 5030498
    GENTRY MINE #3 · 4202263

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5030324
    GENTRY MINE #3 · 4202263

    30 CFR 75.503 · $193.00 proposed penalty

  13. Machinery and equipment; operation and maintenance.

    violationRecord 5030323
    GENTRY MINE #3 · 4202263

    30 CFR 75.1725(a) · $151.00 proposed penalty

  14. Permissible electric face equipment; maintenance.

    violationRecord 5030322
    GENTRY MINE #3 · 4202263

    30 CFR 75.503 · $151.00 proposed penalty

  15. Methane monitors.

    violationRecord 5030321
    GENTRY MINE #3 · 4202263

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  16. Electric equipment; examination, testing and maintenance.

    violationRecord 5030320
    GENTRY MINE #3 · 4202263

    30 CFR 75.512 · $151.00 proposed penalty

  17. Multi-gas detectors.

    violationRecord 9735283
    GENTRY MINE #3 · 4202263

    30 CFR 75.1714-7(a) · $151.00 proposed penalty

  18. Roof control plan.

    violationRecord 9735282
    GENTRY MINE #3 · 4202263

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  19. Escapeways; bituminous and lignite mines.

    violationRecord 9735281
    GENTRY MINE #3 · 4202263

    30 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty

  20. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9735280
    GENTRY MINE #3 · 4202263

    30 CFR 75.1731(a) · $165.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F010B99
    GENTRY MINE #3 · 4202263

    347.5 on-site hours reported

  22. Accumulations of combustible materials.

    violationRecord 5030497
    GENTRY MINE #3 · 4202263

    30 CFR 77.1104 · $151.00 proposed penalty

  23. Accumulations of combustible materials.

    violationRecord 5030496
    GENTRY MINE #3 · 4202263

    30 CFR 77.1104 · $151.00 proposed penalty

  24. Accumulations of combustible materials.

    violationRecord 5030495
    GENTRY MINE #3 · 4202263

    30 CFR 77.1104 · $151.00 proposed penalty

  25. Machinery and equipment; operation and maintenance.

    violationRecord 5030452
    GENTRY MINE #3 · 4202263

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.