Patrick Kerr safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
REDFIELD QUARRY · 14000404.0 on-site hours reported
Regular Safety and Health Inspection
BRONSON QUARRY · 14000725.5 on-site hours reported
Brakes.
BRONSON QUARRY · 140007230 CFR 56.14101(a)(2) · Significant and substantial (S&S) · $366.00 proposed penalty
Flying or falling materials.
BRONSON QUARRY · 140007230 CFR 56.14110 · $151.00 proposed penalty
Warning signs.
BRONSON QUARRY · 140007230 CFR 56.4101 · $151.00 proposed penalty
Regular Safety and Health Inspection
REDFIELD QUARRY · 14000403.0 on-site hours reported
Regular Safety and Health Inspection
BRONSON QUARRY · 14000725.0 on-site hours reported
Eye protection.
REDFIELD QUARRY · 140004030 CFR 56.15004 · Significant and substantial (S&S) · $165.00 proposed penalty
Correction of dangerous conditions.
BRONSON QUARRY · 140007230 CFR 56.12030 · $151.00 proposed penalty
Moving machine parts.
BRONSON QUARRY · 140007230 CFR 56.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
REDFIELD QUARRY · 14000402.3 on-site hours reported
Regular Safety and Health Inspection
BRONSON QUARRY · 14000723.5 on-site hours reported
Safety defects; examination, correction and records.
BRONSON QUARRY · 140007230 CFR 56.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
REDFIELD QUARRY · 14000401.3 on-site hours reported
Warning signs.
BRONSON QUARRY · 140007230 CFR 56.4101 · $151.00 proposed penalty
Safety can use.
BRONSON QUARRY · 140007230 CFR 56.4402 · $151.00 proposed penalty
Regular Safety and Health Inspection
BRONSON QUARRY · 14000729.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.