← Neilton Dias

Neilton Dias safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Controls and switches.

    violationRecord 9809756
    Neilton Quarry · 3610192

    30 CFR 56.12002 · $151.00 proposed penalty

  2. Correction of dangerous conditions.

    violationRecord 9809755
    Neilton Quarry · 3610192

    30 CFR 56.12030 · $151.00 proposed penalty

  3. Insulation and fittings for power wires and cables.

    violationRecord 9809754
    Neilton Quarry · 3610192

    30 CFR 56.12008 · $151.00 proposed penalty

  4. Grounding circuit enclosures.

    violationRecord 9809753
    Neilton Quarry · 3610192

    30 CFR 56.12025 · $151.00 proposed penalty

  5. Grounding circuit enclosures.

    violationRecord 9809752
    Neilton Quarry · 3610192

    30 CFR 56.12025 · Significant and substantial (S&S) · $366.00 proposed penalty

  6. Correction of dangerous conditions.

    violationRecord 9809751
    Neilton Quarry · 3610192

    30 CFR 56.12030 · Significant and substantial (S&S) · $366.00 proposed penalty

  7. Controls and switches.

    violationRecord 9809750
    Neilton Quarry · 3610192

    30 CFR 56.12002 · $151.00 proposed penalty

  8. Protection of gas cylinder valves.

    violationRecord 9806675
    Neilton Quarry · 3610192

    30 CFR 56.16006 · $151.00 proposed penalty

  9. Construction and maintenance of guards.

    violationRecord 9806674
    Neilton Quarry · 3610192

    30 CFR 56.14112(b) · $151.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 9806673
    Neilton Quarry · 3610192

    30 CFR 56.12032 · $151.00 proposed penalty

  11. Inspection and cover plates.

    violationRecord 9806672
    Neilton Quarry · 3610192

    30 CFR 56.12032 · $151.00 proposed penalty

  12. Correction of dangerous conditions.

    violationRecord 9806671
    Neilton Quarry · 3610192

    30 CFR 56.12030

  13. Roll-over protective structures (ROPS) and seat belts.

    violationRecord 9806670
    Neilton Quarry · 3610192

    30 CFR 56.14130(a)(1) · $151.00 proposed penalty

  14. New miner training.

    violationRecord 9806669
    Neilton Quarry · 3610192

    30 CFR 46.5(a) · Significant and substantial (S&S) · $443.00 proposed penalty

  15. Horns and backup alarms.

    violationRecord 9806668
    Neilton Quarry · 3610192

    30 CFR 56.14132(a) · $151.00 proposed penalty

  16. Horns and backup alarms.

    violationRecord 9806667
    Neilton Quarry · 3610192

    30 CFR 56.14132(a) · Significant and substantial (S&S) · $366.00 proposed penalty

  17. Annual refresher training.

    violationRecord 9806662
    Neilton Quarry · 3610192

    30 CFR 46.8(a) · Significant and substantial (S&S) · $443.00 proposed penalty

  18. Training plans.

    violationRecord 9806661
    Neilton Quarry · 3610192

    30 CFR 46.3(a) · $151.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord F013C52
    Neilton Quarry · 3610192

    131.0 on-site hours reported

  20. Identification of power switches.

    violationRecord 9806666
    Neilton Quarry · 3610192

    30 CFR 56.12018 · Significant and substantial (S&S) · $165.00 proposed penalty

  21. Correction of dangerous conditions.

    violationRecord 9806665
    Neilton Quarry · 3610192

    30 CFR 56.12030 · Significant and substantial (S&S) · $1,355.00 proposed penalty

  22. First-aid materials.

    violationRecord 9806660
    Neilton Quarry · 3610192

    30 CFR 56.15001 · $151.00 proposed penalty

  23. New miner training.

    violationRecord 9806659
    Neilton Quarry · 3610192

    30 CFR 46.5 · Significant and substantial (S&S) · $184.00 proposed penalty

  24. Berms or guardrails.

    violationRecord 9806658
    Neilton Quarry · 3610192

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $366.00 proposed penalty

  25. Roll-over protective structures (ROPS) and seat belts.

    violationRecord 9806657
    Neilton Quarry · 3610192

    30 CFR 56.14130(e) · Significant and substantial (S&S) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.