Navajo Transitional Energy Company LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Slip or fall of person
Antelope Coal Mine · 4801337Days away from work only
Accident narrative
It had snowed on and off all day and the temperature was 16 degrees. There was snow on the ground where the employee parked their service truck. The employee exited the service truck and started to walk to the shop. The employee slipped and fell to the ground.
Verbal Hazard Complaint Inspections
Navajo Mine · 29000973.0 on-site hours reported
Illumination.
Navajo Mine · 290009730 CFR 77.207 · $165.00 proposed penalty
Examination and maintenance of firefighting equipment.
Navajo Mine · 290009730 CFR 77.1110 · $193.00 proposed penalty
Examination and maintenance of firefighting equipment.
Navajo Mine · 290009730 CFR 77.1110 · $193.00 proposed penalty
Travelways at surface installations.
Navajo Mine · 290009730 CFR 77.205(e) · $151.00 proposed penalty
Cable fittings; suitability.
Navajo Mine · 290009730 CFR 77.505 · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.