Naceville Materials Inc; Haines & Kibblehouse Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspection
H & K MATERIALS · 36001169.5 on-site hours reported
Regular Safety and Health Inspection
Naceville Materials · 36083478.0 on-site hours reported
Compliance Follow-up Inspection
Belvidere Sand & Gravel · 28010000.0 on-site hours reported
Electrical conductors.
Plumstead Materials · 360854830 CFR 56.12004 · $151.00 proposed penalty
Examination of working places.
Belvidere Sand & Gravel · 280100030 CFR 56.18002(b) · $151.00 proposed penalty
Hand-held power tools.
Belvidere Sand & Gravel · 280100030 CFR 56.14116(a) · $151.00 proposed penalty
Electrical conductors.
Plumstead Materials · 360854830 CFR 56.12004 · $151.00 proposed penalty
Grounding circuit enclosures.
Plumstead Materials · 360854830 CFR 56.12025 · $151.00 proposed penalty
Regular Safety and Health Inspection
Belvidere Sand & Gravel · 28010008.5 on-site hours reported
Regular Safety and Health Inspection
Plumstead Materials · 360854827.3 on-site hours reported
Safety defects; examination, correction and records.
Plumstead Materials · 360854830 CFR 56.14100(b) · $151.00 proposed penalty
Housekeeping.
Plumstead Materials · 360854830 CFR 56.20003(a) · $151.00 proposed penalty
Housekeeping.
Plumstead Materials · 360854830 CFR 56.20003(a) · $151.00 proposed penalty
Trimming stockpile and muckpile faces.
Plumstead Materials · 360854830 CFR 56.9314 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Berms or guardrails.
Plumstead Materials · 360854830 CFR 56.9300(a) · $398.00 proposed penalty
Parking procedures for unattended equipment.
Plumstead Materials · 360854830 CFR 56.14207 · $226.00 proposed penalty
Compliance Follow-up Inspection
H & K MATERIALS · 36001160.8 on-site hours reported
Regular Safety and Health Inspection
H & K MATERIALS · 360011613.5 on-site hours reported
Electrical conductors.
H & K MATERIALS · 360011630 CFR 56.12004 · $151.00 proposed penalty
Construction and maintenance of guards.
H & K MATERIALS · 360011630 CFR 56.14112(a)(1) · $151.00 proposed penalty
Construction and maintenance of guards.
H & K MATERIALS · 360011630 CFR 56.14112(a)(1) · $151.00 proposed penalty
Eye protection.
H & K MATERIALS · 360011630 CFR 56.15004 · Significant and substantial (S&S) · $151.00 proposed penalty
Handling of materials
Naceville Materials · 3608347Dys awy frm wrk & restrctd act
Accident narrative
Moving the Barge that the pump sits on, pushing the barge I felt a pop in my right bicep muscle. Arm is showing signs bicep being pulled up towards shoulder.
Machinery
Plumstead Materials · 3608548All other cases (incl 1st aid)
Accident narrative
EE got burnt while cutting a bolt with a torch.
Safety defects; examination, correction and records.
Belvidere Sand & Gravel · 280100030 CFR 56.14100(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.