Mohegan Energy Trustees LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Loading and haulage equipment; inspection and maintenance.
Highwall Park Surface Mine · 460961230 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Highwall Park Surface Mine · 460961230 CFR 77.1606(c) · $151.00 proposed penalty
Bathing facilities; change rooms; sanitary flush toilet facilities.
Highwall Park Surface Mine · 460961230 CFR 71.400 · $504.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Highwall Park Surface Mine · 460961230 CFR 77.1606(c) · $151.00 proposed penalty
Accumulations of combustible materials.
Highwall Park Surface Mine · 460961230 CFR 77.1104 · $151.00 proposed penalty
Drilling; general.
Highwall Park Surface Mine · 460961230 CFR 77.1007(b) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Highwall Park Surface Mine · 460961230 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Highwall Park Surface Mine · 460961230 CFR 77.1606(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
Highwall Park Surface Mine · 460961225.5 on-site hours reported
Regular Safety and Health Inspection
OLAN PROCESSING PLANT · 460955619.3 on-site hours reported
Loading and haulage equipment; installations.
OLAN PROCESSING PLANT · 460955630 CFR 77.1605(e) · $151.00 proposed penalty
Drilling; general.
Godfrey Branch Surface Mine · 460961330 CFR 77.1007(b) · $151.00 proposed penalty
Flammable liquids; storage.
Godfrey Branch Surface Mine · 460961330 CFR 77.1103(d) · $151.00 proposed penalty
Regular Safety and Health Inspection
SHM #67 · 460937421.0 on-site hours reported
Loading and haulage equipment; operation.
Highwall Park Surface Mine · 460961230 CFR 77.1607(i) · Significant and substantial (S&S) · $151.00 proposed penalty
Travelways at surface installations.
Highwall Park Surface Mine · 460961230 CFR 77.205(a) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Highwall Park Surface Mine · 460961230 CFR 77.404(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Switchback Loadout · 460944111.0 on-site hours reported
Mechanical equipment guards.
Switchback Loadout · 460944130 CFR 77.400(a) · $151.00 proposed penalty
Requirement for an MSDS.
Switchback Loadout · 460944130 CFR 47.51 · $151.00 proposed penalty
Waiver of surface facilities requirements; posting of waiver.
Switchback Loadout · 460944130 CFR 71.403(c) · $151.00 proposed penalty
Periodic examinations.
Switchback Loadout · 460944130 CFR 72.100(e) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Switchback Loadout · 460944130 CFR 50.30(a) · $151.00 proposed penalty
Mine map.
Highwall Park Surface Mine · 460961230 CFR 77.1200 · Significant and substantial (S&S) · $245.00 proposed penalty
Highwalls, pits and spoil banks; plans.
Highwall Park Surface Mine · 460961230 CFR 77.1000 · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.