Mitchell Brown safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
FOUNTAIN SPRINGS · 04051803.3 on-site hours reported
Regular Safety and Health Inspection
Decomposed Granite Pit (LG) · 04056945.0 on-site hours reported
Overhead drive belts.
TULE RIVER/SUCCESS DAM · 040531330 CFR 56.14108 · Significant and substantial (S&S) · $177.00 proposed penalty
Construction and maintenance of ladders.
TULE RIVER/SUCCESS DAM · 040531330 CFR 56.11003 · $151.00 proposed penalty
Safety defects; examination, correction and records.
TULE RIVER/SUCCESS DAM · 040531330 CFR 56.14100(b) · Significant and substantial (S&S) · $267.00 proposed penalty
Temporary, portable containers.
TULE RIVER/SUCCESS DAM · 040531330 CFR 47.44(a)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
TULE RIVER/SUCCESS DAM · 040531316.0 on-site hours reported
Regular Safety and Health Inspection
FOUNTAIN SPRINGS · 04051803.0 on-site hours reported
Regular Safety and Health Inspection
Decomposed Granite Pit (LG) · 04056944.0 on-site hours reported
Electrical conductors.
TULE RIVER/SUCCESS DAM · 040531330 CFR 56.12004 · $398.00 proposed penalty
Temporary, portable containers.
TULE RIVER/SUCCESS DAM · 040531330 CFR 47.44(a)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
TULE RIVER/SUCCESS DAM · 040531313.0 on-site hours reported
Regular Safety and Health Inspection
Decomposed Granite Pit (LG) · 04056944.5 on-site hours reported
Newly hired experienced miner training.
TULE RIVER/SUCCESS DAM · 040531330 CFR 46.6(b) · $168.00 proposed penalty
Safety belts and lines.
TULE RIVER/SUCCESS DAM · 040531330 CFR 56.15005 · Significant and substantial (S&S) · $151.00 proposed penalty
Moving machine parts.
TULE RIVER/SUCCESS DAM · 040531330 CFR 56.14107(a) · Significant and substantial (S&S) · $267.00 proposed penalty
Moving machine parts.
TULE RIVER/SUCCESS DAM · 040531330 CFR 56.14107(a) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
TULE RIVER/SUCCESS DAM · 040531330 CFR 56.12008 · $151.00 proposed penalty
Electrical conductors.
TULE RIVER/SUCCESS DAM · 040531330 CFR 56.12004 · $151.00 proposed penalty
Regular Safety and Health Inspection
TULE RIVER/SUCCESS DAM · 04053139.5 on-site hours reported
Examination of working places.
FOUNTAIN SPRINGS · 040518030 CFR 56.18002(b) · Significant and substantial (S&S) · $432.00 proposed penalty
Regular Safety and Health Inspection
FOUNTAIN SPRINGS · 040518010.8 on-site hours reported
Moving machine parts.
FOUNTAIN SPRINGS · 040518030 CFR 56.14107(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Moving machine parts.
FOUNTAIN SPRINGS · 040518030 CFR 56.14107(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Moving machine parts.
FOUNTAIN SPRINGS · 040518030 CFR 56.14107(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.