← Mc Carthy- Bush Corp

Mc Carthy- Bush Corp safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Fire

    accidentRecord 220262940001
    Linwood Lime Plant · 1301617

    Accident only

    Accident narrative

    On 10/13 at 3:05, I received a call that we had a fire inside of our coke mill dust collector, which prompted calling the fire department. The fire stayed contained in the dust collector tank, and the fire department was able to get the tank emptied and all smoldering coke extinguished. A true ignition source has not yet been determined.

  2. Handling of materials

    accidentRecord 220262860011
    Linwood Lime Plant · 1301617

    Days away from work only

    Accident narrative

    Miner was doing EE's pre-op inspection of skid steer and went to step into the cab as EE went to lift EE's right leg EE felt a pop and resulting pain in EE's right calf.

  3. Handling of materials

    accidentRecord 220262510002
    Linwood Mine · 1300097

    Days restricted activity only

    Accident narrative

    Miner was climbing into a haul truck after fueling up, as EE went to pull self up onto the ladder EE felt a pop and pain in EE's shoulder.

  4. Insulation and fittings for power wires and cables.

    violationRecord 5118958
    Linwood Mine · 1300097

    30 CFR 57.12008 · $151.00 proposed penalty

  5. General requirements.

    violationRecord 5118957
    Linwood Mine · 1300097

    30 CFR 57.4200(b)(2) · $151.00 proposed penalty

  6. Moving machine parts.

    violationRecord 5118956
    Linwood Mine · 1300097

    30 CFR 57.14107(a) · $193.00 proposed penalty

  7. Safety defects; examination, correction and records.

    violationRecord 5118955
    Linwood Mine · 1300097

    30 CFR 57.14100(a) · Significant and substantial (S&S) · $288.00 proposed penalty

  8. Surface electric substations and liquid storage facilities.

    violationRecord 5118954
    Linwood Mine · 1300097

    30 CFR 57.4130(a)(2) · $151.00 proposed penalty

  9. Construction and maintenance of ladders.

    violationRecord 5118953
    Linwood Mine · 1300097

    30 CFR 57.11003 · $151.00 proposed penalty

  10. Handrails and toeboards.

    violationRecord 5118952
    Linwood Mine · 1300097

    30 CFR 57.11002 · $151.00 proposed penalty

  11. Safe access.

    violationRecord 5118951
    Linwood Mine · 1300097

    30 CFR 57.11001 · Significant and substantial (S&S) · $642.00 proposed penalty

  12. Handrails and toeboards.

    violationRecord 5118950
    Linwood Mine · 1300097

    30 CFR 57.11002 · Significant and substantial (S&S) · $336.00 proposed penalty

  13. Handrails and toeboards.

    violationRecord 5118949
    Linwood Mine · 1300097

    30 CFR 57.11002 · Significant and substantial (S&S) · $336.00 proposed penalty

  14. Correction of hazardous conditions.

    violationRecord 5118948
    Linwood Mine · 1300097

    30 CFR 57.3200 · $151.00 proposed penalty

  15. General requirements.

    violationRecord 5118947
    Linwood Mine · 1300097

    30 CFR 57.4200(b)(2) · $165.00 proposed penalty

  16. Combustible waste.

    violationRecord 5118946
    Linwood Mine · 1300097

    30 CFR 57.4104(a) · $151.00 proposed penalty

  17. Correction of hazardous conditions.

    violationRecord 5118945
    Linwood Mine · 1300097

    30 CFR 57.3200 · Significant and substantial (S&S) · $3,736.00 proposed penalty

  18. Electrical conductors.

    violationRecord 5118944
    Linwood Mine · 1300097

    30 CFR 57.12004 · $226.00 proposed penalty

  19. Machinery, equipment, and tools.

    violationRecord 5118943
    Linwood Mine · 1300097

    30 CFR 57.14205 · Significant and substantial (S&S) · $755.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 5118942
    Linwood Mine · 1300097

    30 CFR 57.14100(c) · $366.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F037BD6
    Linwood Mine · 1300097

    52.3 on-site hours reported

  22. Fall of roof or back

    accidentRecord 220261410010
    Linwood Mine · 1300097

    Days restricted activity only

    Accident narrative

    Miner was loading a room with explosives from the man basket of the powder rig, when a softball sized rock fell and hit EE on the hand that was resting on the handrail, resulting in injury.

  23. Testing grounding systems.

    violationRecord 5118899
    Linwood Mine · 1300097

    30 CFR 57.12028 · $151.00 proposed penalty

  24. Safety defects; examination, correction and records.

    violationRecord 5118898
    Linwood Mine · 1300097

    30 CFR 57.14100(c) · $288.00 proposed penalty

  25. Inspection and cover plates.

    violationRecord 5118897
    Linwood Mine · 1300097

    30 CFR 57.12032 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.