  1. Berms or guardrails.

    violationRecord 9697550
    T-Sab Screener · 2003451

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  2. Regular Safety and Health Inspection

    inspectionRecord F0269A9
    Lennox Gravel Crusher · 2000670

    9.3 on-site hours reported

  3. Regular Safety and Health Inspection

    inspectionRecord F0269A8
    T-Sab Screener · 2003451

    10.5 on-site hours reported

  4. Protection for openings around travelways.

    violationRecord 9697552
    Lennox Gravel Crusher · 2000670

    30 CFR 56.11012 · Significant and substantial (S&S) · $165.00 proposed penalty

  5. Scaffolds and working platforms.

    violationRecord 9697551
    Lennox Gravel Crusher · 2000670

    30 CFR 56.11027 · Significant and substantial (S&S) · $165.00 proposed penalty

  6. Insulation and fittings for power wires and cables.

    violationRecord 9697549
    T-Sab Screener · 2003451

    30 CFR 56.12008 · Significant and substantial (S&S) · $398.00 proposed penalty

  7. Notification of commencement of operations and closing of mines.

    violationRecord 9697548
    T-Sab Screener · 2003451

    30 CFR 56.1000 · $151.00 proposed penalty

  8. Construction and maintenance of guards.

    violationRecord 9697547
    T-Sab Screener · 2003451

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $177.00 proposed penalty

  9. Handrails and toeboards.

    violationRecord 9697546
    T-Sab Screener · 2003451

    30 CFR 56.11002 · Significant and substantial (S&S) · $151.00 proposed penalty

  10. Grounding circuit enclosures.

    violationRecord 9697545
    T-Sab Screener · 2003451

    30 CFR 56.12025 · $151.00 proposed penalty

  11. Construction and maintenance of guards.

    violationRecord 9697544
    T-Sab Screener · 2003451

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $592.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.