Matt Duffield; Luke B Duffield; David D Duffield safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspection
Gum Log Quarry · 03016180.0 on-site hours reported
General instructions for completing MSHA Form 7000-1.
Gum Log Quarry · 030161830 CFR 50.20-1 · $151.00 proposed penalty
Regular Safety and Health Inspection
Pryor Mtn. Quarry · 03020318.0 on-site hours reported
General instructions for completing MSHA Form 7000-1.
Pryor Mtn. Quarry · 030203130 CFR 50.20-1 · $151.00 proposed penalty
Stationary grinding machines.
Pryor Mtn. Quarry · 030203130 CFR 56.14115(b) · $151.00 proposed penalty
Construction and maintenance of guards.
Pryor Mtn. Quarry · 030203130 CFR 56.14112(b) · $151.00 proposed penalty
Compliance Follow-up Inspection
South New Hope Quarry & Plant · 03009101.0 on-site hours reported
Compliance Follow-up Inspection
South New Hope Quarry & Plant · 03009102.3 on-site hours reported
Examination of working places.
South New Hope Quarry & Plant · 030091030 CFR 56.18002(d) · $151.00 proposed penalty
Examination of working places.
South New Hope Quarry & Plant · 030091030 CFR 56.18002(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
South New Hope Quarry & Plant · 030091016.5 on-site hours reported
Identification of power switches.
South New Hope Quarry & Plant · 030091030 CFR 56.12018 · $177.00 proposed penalty
Flying or falling materials.
South New Hope Quarry & Plant · 030091030 CFR 56.14110 · $177.00 proposed penalty
Housekeeping.
South New Hope Quarry & Plant · 030091030 CFR 56.20003(b) · $177.00 proposed penalty
New task training.
Gum Log Quarry · 030161830 CFR 46.7(a) · $168.00 proposed penalty
Regular Safety and Health Inspection
Gum Log Quarry · 030161817.5 on-site hours reported
Identification of power switches.
Gum Log Quarry · 030161830 CFR 56.12018 · $151.00 proposed penalty
Construction and maintenance of guards.
Gum Log Quarry · 030161830 CFR 56.14112(b) · $151.00 proposed penalty
Construction and maintenance of guards.
Gum Log Quarry · 030161830 CFR 56.14112(b) · $151.00 proposed penalty
Identification of power switches.
Gum Log Quarry · 030161830 CFR 56.12018 · $193.00 proposed penalty
Construction and maintenance of guards.
Gum Log Quarry · 030161830 CFR 56.14112(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Alexander Quarry · 03020823.3 on-site hours reported
Changes; notification by operator.
Alexander Quarry · 030208230 CFR 41.12 · $151.00 proposed penalty
Regular Safety and Health Inspection
Midway Quarry · 030208514.8 on-site hours reported
Eye protection.
Midway Quarry · 030208530 CFR 56.15004 · Significant and substantial (S&S) · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.