Martin Marietta Materials Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Examination of working places.
Sully Mine · 130006330 CFR 57.18002(d) · $151.00 proposed penalty
Testing grounding systems.
Sunflower Quarry · 140155630 CFR 56.12028 · $151.00 proposed penalty
Inspection.
Broken Bow Sand & Gravel · 340046030 CFR 56.4201(a)(1) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Mill Creek · 340128530 CFR 56.14100(b) · $151.00 proposed penalty
Locking transformer enclosures.
Forks of the River Quarry · 400161030 CFR 56.12068 · $226.00 proposed penalty
Extinguisher recharging or replacement.
Martin Marietta Merkel Plant · 410384830 CFR 56.4203 · $151.00 proposed penalty
Inspection.
Martin Marietta Merkel Plant · 410384830 CFR 56.4201 · $151.00 proposed penalty
Identification of power switches.
Martin Marietta Merkel Plant · 410384830 CFR 56.12018 · $165.00 proposed penalty
Housekeeping.
Martin Marietta Merkel Plant · 410384830 CFR 56.20003(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
Sully Mine · 130006326.5 on-site hours reported
Regular Safety and Health Inspection
Sunflower Quarry · 140155613.8 on-site hours reported
Regular Safety and Health Inspection
Kent Sand & Gravel Quarry · 18007459.8 on-site hours reported
Regular Safety and Health Inspection
Martin Marietta Merkel Plant · 41038489.5 on-site hours reported
Regular Safety and Health Inspection
Webberville S&G · 410436315.0 on-site hours reported
Regular Safety and Health Inspection
Granite Canyon Quarry · 480001838.8 on-site hours reported
Inspection.
Sully Mine · 130006330 CFR 57.4201(a)(2) · $151.00 proposed penalty
Seat belts for surface haulage trucks.
Sully Mine · 130006330 CFR 57.14131(a) · $151.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Sunflower Quarry · 140155630 CFR 56.14130(g) · $1,219.00 proposed penalty
Requirement for container labels.
Sunflower Quarry · 140155630 CFR 47.41(a)(1) · $151.00 proposed penalty
Electrical conductors.
Sunflower Quarry · 140155630 CFR 56.12004 · $245.00 proposed penalty
Protection for openings around travelways.
Sunflower Quarry · 140155630 CFR 56.11012 · $151.00 proposed penalty
Spillage and leakage.
Sunflower Quarry · 140155630 CFR 56.4102 · $151.00 proposed penalty
Spillage and leakage.
Sunflower Quarry · 140155630 CFR 56.4102 · $151.00 proposed penalty
Site-specific hazard awareness training.
Sunflower Quarry · 140155630 CFR 46.11(a) · $1,355.00 proposed penalty
Inspection and cover plates.
Kent Sand & Gravel Quarry · 180074530 CFR 56.12032 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.