Martin Marietta Materials Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Action level.
CHESTERFIELD QUARRY · 380068230 CFR 62.120 · $151.00 proposed penalty
Action level.
CHESTERFIELD QUARRY · 380068230 CFR 62.120 · $151.00 proposed penalty
Electrical
E-Town S&G - 460 · 3304279Days restricted activity only
Accident narrative
An electrician was involved in an arc flash type event which resulted in burns on EE's left hand.
Regular Safety and Health Inspection
DOUGLAS PLANT · 02000226.5 on-site hours reported
Regular Safety and Health Inspection
Six Mile Quarry · 09011449.0 on-site hours reported
Regular Safety and Health Inspection
New Miami Plant · 33043833.0 on-site hours reported
Warnings prior to starting or moving equipment.
Bluff City Mine · 110012230 CFR 57.14200
Identification of power switches.
Bridgeport Stone Plant · 410000730 CFR 56.12018 · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Clifton Plant · 410001330 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Clifton Plant · 410001330 CFR 50.30(a) · $151.00 proposed penalty
Moving machine parts.
Clifton Plant · 410001330 CFR 56.14107(a) · Significant and substantial (S&S)
Moving machine parts.
Clifton Plant · 410001330 CFR 56.14107(a)
Regular Safety and Health Inspection
WATAUGA QUARRY · 400012434.5 on-site hours reported
Housekeeping.
Clayton Aggregates · 040015930 CFR 56.20003(c) · $151.00 proposed penalty
Moving machine parts.
Clayton Aggregates · 040015930 CFR 56.14107(a) · $151.00 proposed penalty
Surface electric substations and liquid storage facilities.
Bluff City Mine · 110012230 CFR 57.4130(b)
Safe access.
Bluff City Mine · 110012230 CFR 57.11001
Fuel lines.
WATAUGA QUARRY · 400012430 CFR 56.4501 · $151.00 proposed penalty
Requirement for container labels.
Bridgeport Stone Plant · 410000730 CFR 47.41(a) · $151.00 proposed penalty
General requirements.
Bridgeport Stone Plant · 410000730 CFR 56.4200(b)(2)
Safety defects; examination, correction and records.
Bridgeport Stone Plant · 410000730 CFR 56.14100(b) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Clifton Plant · 410001330 CFR 50.30(a) · $151.00 proposed penalty
Identification of power switches.
Clifton Plant · 410001330 CFR 56.12018 · $151.00 proposed penalty
Securing movable parts.
Clifton Plant · 410001330 CFR 56.14206(b) · $151.00 proposed penalty
Inspection and cover plates.
Clifton Plant · 410001330 CFR 56.12032 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.