← Maria Cantwell; Bonnie R Ryan; Brian R Rich

Maria Cantwell; Bonnie R Ryan; Brian R Rich safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Written safety program.

    violationRecord 5262212
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.2102(a)

  2. Loading and haulage equipment; installations.

    violationRecord 5262211
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1605(b)

  3. Quantity and location of firefighting equipment.

    violationRecord 5262210
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1109(c)(1)

  4. Mobile equipment; rollover protective structures (ROPS).

    violationRecord 5262209
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.403-1(d)

  5. Examination and maintenance of firefighting equipment.

    violationRecord 5262208
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1110

  6. Loading and haulage equipment; installations.

    violationRecord 5262207
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1605(b)

  7. Storage of materials.

    violationRecord 5262206
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.208(e)

  8. Examination and maintenance of firefighting equipment.

    violationRecord 5262205
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1110

  9. Loading and haulage equipment; installations.

    violationRecord 5262204
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1605(b)

  10. Mobile equipment; automatic warning devices.

    violationRecord 5262203
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.410(a)(1)

  11. Quantity and location of firefighting equipment.

    violationRecord 5262202
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1109(c)(1)

  12. Mobile equipment; automatic warning devices.

    violationRecord 5262201
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.410(a)(1)

  13. Temporary, portable containers.

    violationRecord 5078200
    Buck Run P-8 P-10 · 3601965

    30 CFR 47.44(b)

  14. Illumination.

    violationRecord 5078199
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.207 · Significant and substantial (S&S)

  15. Compliance Follow-up Inspection

    inspectionRecord F03D893
    Ellangowan Stripping · 3608860

    1.0 on-site hours reported

  16. Lightning arresters, ungrounded and exposed power conductors and telephone wires.

    violationRecord 5078198
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.508

  17. Dumping facilities.

    violationRecord 5078197
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1608(a)

  18. Protection of trailing cables.

    violationRecord 5078196
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.604

  19. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5078195
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1606(c)

  20. Travelways at surface installations.

    violationRecord 5078194
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.205(b)

  21. Illumination.

    violationRecord 5078193
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.207

  22. Examination and maintenance of firefighting equipment.

    violationRecord 5078192
    Buck Run P-8 P-10 · 3601965

    30 CFR 77.1110

  23. Regular Safety and Health Inspection

    inspectionRecord F038900
    Buck Run P-8 P-10 · 3601965

    27.3 on-site hours reported

  24. Spot Inspection

    inspectionRecord F0388FD
    Girard Breaker · 3608581

    10.3 on-site hours reported

  25. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5078184
    Girard Breaker · 3608581

    30 CFR 77.1606(c)

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.