Marcus L Dyess safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F041250
    Plant 3 · 1601612

    11.5 on-site hours reported

  2. General requirements.

    violationRecord 5178310
    Plant 3 · 1601612

    30 CFR 56.4200(b)(2)

  3. Safety defects; examination, correction and records.

    violationRecord 5178309
    Plant 3 · 1601612

    30 CFR 56.14100(b)

  4. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5174872
    Plant 3 · 1601612

    30 CFR 50.30(a) · $151.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F03E08F
    Plant 3 · 1601612

    4.5 on-site hours reported

  6. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5174868
    Plant 2 · 1601598

    30 CFR 50.30(a) · $151.00 proposed penalty

  7. Legal identity report.

    violationRecord 5174867
    Plant 2 · 1601598

    30 CFR 41.20 · $151.00 proposed penalty

  8. Electrical conductors.

    violationRecord 5174866
    Plant 2 · 1601598

    30 CFR 56.12004 · $151.00 proposed penalty

  9. Safe access.

    violationRecord 5174865
    Plant 2 · 1601598

    30 CFR 56.11001 · Significant and substantial (S&S) · $165.00 proposed penalty

  10. Construction and maintenance of guards.

    violationRecord 5174864
    Plant 2 · 1601598

    30 CFR 56.14112(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  11. Safe access.

    violationRecord 5174863
    Plant 2 · 1601598

    30 CFR 56.11001 · Significant and substantial (S&S) · $165.00 proposed penalty

  12. Hard hats.

    violationRecord 5174871
    Plant 3 · 1601612

    30 CFR 56.15002 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  13. Requirement for container labels.

    violationRecord 5174870
    Plant 3 · 1601612

    30 CFR 47.41(a) · $209.00 proposed penalty

  14. Housekeeping.

    violationRecord 5174869
    Plant 3 · 1601612

    30 CFR 56.20003(a) · $209.00 proposed penalty

  15. Regular Safety and Health Inspection

    inspectionRecord F03E08E
    Plant 2 · 1601598

    10.5 on-site hours reported

  16. New miner training.

    violationRecord 5174862
    Plant 2 · 1601598

    30 CFR 46.5(a) · Significant and substantial (S&S) · $245.00 proposed penalty

  17. New miner training.

    violationRecord 5174861
    Plant 2 · 1601598

    30 CFR 46.5(a) · Significant and substantial (S&S)

  18. Electrical conductors.

    violationRecord 5174860
    Plant 2 · 1601598

    30 CFR 56.12004 · $151.00 proposed penalty

  19. Construction and maintenance of guards.

    violationRecord 5174859
    Plant 2 · 1601598

    30 CFR 56.14112(a) · Significant and substantial (S&S) · $245.00 proposed penalty

  20. Securing gas cylinders.

    violationRecord 5174858
    Plant 2 · 1601598

    30 CFR 56.16005 · $151.00 proposed penalty

  21. Access to stationary electrical equipment or switchgear.

    violationRecord 5174857
    Plant 2 · 1601598

    30 CFR 56.12019 · $151.00 proposed penalty

  22. Compliance Follow-up Inspection

    inspectionRecord 6933191
    Plant 2 · 1601598

    1.0 on-site hours reported

  23. Regular Safety and Health Inspection

    inspectionRecord F002D24
    Plant 3 · 1601612

    13.0 on-site hours reported

  24. Testing grounding systems.

    violationRecord 5005440
    Plant 3 · 1601612

    30 CFR 56.12028 · $151.00 proposed penalty

  25. Construction and maintenance of guards.

    violationRecord 5005439
    Plant 3 · 1601612

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.