← Manhattan Gulch Partners LLC

Manhattan Gulch Partners LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Protection of gas cylinder valves.

    violationRecord 5103463
    Manhattan Gulch · 2602658

    30 CFR 56.16006 · Significant and substantial (S&S) · $4,383.00 proposed penalty

  2. Controls and switches.

    violationRecord 5103462
    Manhattan Gulch · 2602658

    30 CFR 56.12002 · $267.00 proposed penalty

  3. Notification of commencement of operations and closing of mines.

    violationRecord 5103461
    Manhattan Gulch · 2602658

    30 CFR 56.1000 · $165.00 proposed penalty

  4. Changes; notification by operator.

    violationRecord 5103460
    Manhattan Gulch · 2602658

    30 CFR 41.12 · $151.00 proposed penalty

  5. Testing grounding systems.

    violationRecord 5103459
    Manhattan Gulch · 2602658

    30 CFR 56.12028 · $592.00 proposed penalty

  6. Moving machine parts.

    violationRecord 5103458
    Manhattan Gulch · 2602658

    30 CFR 56.14107(a) · $4,047.00 proposed penalty

  7. Inspection and cover plates.

    violationRecord 5103457
    Manhattan Gulch · 2602658

    30 CFR 56.12032 · $592.00 proposed penalty

  8. Insulation and fittings for power wires and cables.

    violationRecord 5103455
    Manhattan Gulch · 2602658

    30 CFR 56.12008 · $267.00 proposed penalty

  9. Securing gas cylinders.

    violationRecord 5103454
    Manhattan Gulch · 2602658

    30 CFR 56.16005 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  10. Work on electrically-powered equipment.

    violationRecord 5103453
    Manhattan Gulch · 2602658

    30 CFR 56.12016 · Significant and substantial (S&S) · $4,383.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F0254F6
    Manhattan Gulch · 2602658

    31.5 on-site hours reported

  12. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9686597
    Manhattan Gulch · 2602658

    30 CFR 50.30(a) · $151.00 proposed penalty

  13. Regular Safety and Health Inspection

    inspectionRecord F010CB2
    Manhattan Gulch · 2602658

    14.3 on-site hours reported

  14. Insulation and fittings for power wires and cables.

    violationRecord 9999383
    Manhattan Gulch · 2602658

    30 CFR 56.12008 · $267.00 proposed penalty

  15. Insulation and fittings for power wires and cables.

    violationRecord 9999382
    Manhattan Gulch · 2602658

    30 CFR 56.12008 · $177.00 proposed penalty

  16. Moving machine parts.

    violationRecord 9999381
    Manhattan Gulch · 2602658

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  17. Moving machine parts.

    violationRecord 9999380
    Manhattan Gulch · 2602658

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  18. Construction and maintenance of guards.

    violationRecord 9686596
    Manhattan Gulch · 2602658

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  19. Construction and maintenance of guards.

    violationRecord 9686595
    Manhattan Gulch · 2602658

    30 CFR 56.14112(b) · $592.00 proposed penalty

  20. Moving machine parts.

    violationRecord 9686594
    Manhattan Gulch · 2602658

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  21. Securing gas cylinders.

    violationRecord 9686593
    Manhattan Gulch · 2602658

    30 CFR 56.16005 · $592.00 proposed penalty

  22. Moving machine parts.

    violationRecord 9686592
    Manhattan Gulch · 2602658

    30 CFR 56.14107(a) · $177.00 proposed penalty

  23. Berms or guardrails.

    violationRecord 9686591
    Manhattan Gulch · 2602658

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  24. New task training.

    violationRecord 9686590
    Manhattan Gulch · 2602658

    30 CFR 46.7(a) · $252.00 proposed penalty

  25. Notification of commencement of operations and closing of mines.

    violationRecord 9686589
    Manhattan Gulch · 2602658

    30 CFR 56.1000 · $165.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.