Coal production
1,088,457reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Aces Branch Mine #91519441 · Active6/8 quarters reported | Leslie, KYSurface · MSHA: Coal (Bituminous) | 259,774 | 82,724 | 19 | 2 | 403.5 |
| Alum Cave #171519766 · Active6/8 quarters reported | Knott, KYSurface · MSHA: Coal (Bituminous) | 374,272 | 121,857 | 27 | 1 | 442.8 |
| Big Branch #341519906 · Active6/8 quarters reported | Pike, KYSurface · MSHA: Coal (Bituminous) | 454,411 | 140,932 | 25 | 2 | 270.8 |
| Pioneer Preparation Plant1516858 · Active6/8 quarters reported | Knott, KYFacility · MSHA: Coal (Bituminous) | 0 | 22,955 | 15 | 0 | 331.0 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
4 of 4 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 4 mines listed under this controller were checked; 4 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 195,361 | 66,096 | 2.96 | 116 | 4/4 mines reporting |
| 2025 Q2 | 176,280 | 68,101 | 2.59 | 112 | 4/4 mines reporting |
| 2025 Q3 | 152,487 | 46,588 | 3.27 | 108 | 4/4 mines reporting |
| 2025 Q4 | 217,932 | 65,439 | 3.33 | 102 | 4/4 mines reporting |
| 2026 Q1 | 191,296 | 59,325 | 3.22 | 102 | 4/4 mines reporting |
| 2026 Q2 | 155,101 | 62,919 | 2.47 | 105 | 4/4 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
11 significant & substantial (S&S)
0 records classified as fatality
80 of 86 violations with amounts
37 inspections · 37 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 12 | 0 | 2,015.00 | 1 | 0 | 5 | 152.0 |
| 2025-Q2 | 32 | 5 | 12,179.00 | 0 | 0 | 4 | 361.0 |
| 2025-Q3 | 0 | 0 | — | 0 | 0 | 7 | 60.0 |
| 2025-Q4 | 15 | 3 | 4,134.00 | 1 | 0 | 3 | 236.8 |
| 2026-Q1 | 8 | 0 | 2,736.00 | 1 | 0 | 6 | 199.3 |
| 2026-Q2 | 13 | 2 | 2,253.00 | 1 | 0 | 6 | 335.0 |
| 2026-Q3 | 5 | 0 | 302.00 | 1 | 0 | 4 | 104.0 |
| 2026-Q4 * | 1 | 1 | — | 0 | 0 | 2 | 0.0 |
All violations issued in the selected period. Counts combine subsections.
77.404(a) · S&S
Regular Safety and Health Inspection · 0.0 on-site hours
Regular Safety and Health Inspection · 0.0 on-site hours
Spot Inspection · 13.0 on-site hours
Non-Injury Accident Investigation · 21.5 on-site hours
Description not reported
FIRE · ACCIDENT ONLY
The company believes that a large hydraulic hose ruptured near the turbocharger, resulting in the ignition of a fire. The fire severely damaged the dozer.
77.1605(a)
77.1606(c)
Spot Inspection · 62.5 on-site hours
Impoundment Spot Inspection · 7.0 on-site hours
77.1104 · $151.00 proposed
77.1606(c) · $151.00 proposed
77.1606(c) · $151.00 proposed
Spot Inspection · 6.0 on-site hours
Non-Fatal Accident Investigation · 7.5 on-site hours
77.404(c) · S&S
MACHINERY · DAYS AWAY FROM WORK ONLY
The employee accessed the engine compartment of a Caterpillar D10R dozer to adjust the water valves for the cab heating system. While the engine was running, the employee's hand came into contact with the rotating belt and pulley assembly, resulting in an injury.
Regular Safety and Health Inspection · 46.5 on-site hours
72.620 · $151.00 proposed
77.1606(c) · $151.00 proposed
77.1606(c) · $151.00 proposed
77.1605(d) · $151.00 proposed
77.1606(c) · $151.00 proposed
77.1605(k) · S&S · $592.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 69,133 | 12,427 | 0.80 | 10.81 | 106.45 | |
| 2025-Q4 | 99,583 | 12,532 | 0.92 | 10.25 | 107.36 | |
| 2026-Q1 | 122,249 | 12,496 | 0.91 | 10.44 | 111.67 | |
| 2026-Q2 | 132,481 | 12,493 | 0.83 | 10.68 | 115.80 | |
| 2026-Q3 * | 44,813 | 12,439 | 0.76 | 10.27 | 113.74 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 11578 · preliminary | ACES BRANCH MINE #91519441 | Cooper1384 · KY · B & W RESOURCES | 6,805 | 105.11 | 12,245 | 0.78 | 11.00 | SpotBIT | Truck |
| 2026-07EIA row 11861 · preliminary | PIONEER PREPARATION PLANT1516858 | Wateree3297 · SC · B & W RESOURCES | 12,757 | 112.65 | 12,470 | 0.73 | 10.80 | SpotBIT | Rail |
| 2026-07EIA row 11869 · preliminary | PIONEER PREPARATION PLANT1516858 | Williams3298 · SC · B & W RESOURCES | 25,251 | 116.62 | 12,475 | 0.77 | 9.80 | SpotBIT | Rail |
| 2026-06EIA row 9689 · preliminary | ACES BRANCH MINE #91519441 | Cooper1384 · KY · B & W RESOURCES | 7,922 | 103.14 | 12,015 | 0.93 | 13.20 | SpotBIT | Truck |
| 2026-06EIA row 9962 · preliminary | PIONEER PREPARATION PLANT1516858 | Wateree3297 · SC · B & W RESOURCES | 12,739 | 115.31 | 12,520 | 0.83 | 10.70 | ContractBIT | Rail |
| 2026-06EIA row 9971 · preliminary | PIONEER PREPARATION PLANT1516858 | Williams3298 · SC · B & W RESOURCES | 37,939 | 119.51 | 12,575 | 0.79 | 10.50 | ContractBIT | Rail |
| 2026-05EIA row 8118 · preliminary | PIONEER PREPARATION PLANT1516858 | Wateree3297 · SC · B & W RESOURCES | 11,804 | 115.22 | 12,565 | 0.84 | 10.20 | ContractBIT | Rail |
| 2026-05EIA row 8490 · preliminary | PIONEER PREPARATION PLANT1516858 | Cope7210 · SC · B & W RESOURCES | 24,722 | 116.85 | 12,500 | 0.83 | 10.50 | SpotBIT | Rail |
| 2026-04EIA row 6302 · preliminary | PIONEER PREPARATION PLANT1516858 | Wateree3297 · SC · B & W RESOURCES | 12,776 | 112.72 | 12,455 | 0.86 | 10.60 | ContractBIT | Rail |
| 2026-04EIA row 6307 · preliminary | PIONEER PREPARATION PLANT1516858 | Williams3298 · SC · B & W RESOURCES | 24,579 | 115.24 | 12,485 | 0.82 | 10.60 | ContractBIT | Rail |
| 2026-03EIA row 4504 · preliminary | PIONEER PREPARATION PLANT1516858 | Williams3298 · SC · B & W RESOURCES | 23,981 | 112.32 | 12,475 | 0.91 | 10.30 | SpotBIT | Rail |
| 2026-02EIA row 2256 · preliminary | ACES BRANCH MINE #91519441 | Cooper1384 · KY · B & W RESOURCES | 5,081 | 99.32 | 12,210 | 0.93 | 12.50 | SpotBIT | Truck |
| 2026-02EIA row 2533 · preliminary | PIONEER PREPARATION PLANT1516858 | Wateree3297 · SC · B & W RESOURCES | 36,063 | 109.44 | 12,490 | 0.98 | 10.50 | ContractBIT | Rail |
| 2026-02EIA row 2540 · preliminary | PIONEER PREPARATION PLANT1516858 | Williams3298 · SC · B & W RESOURCES | 23,074 | 115.23 | 12,550 | 0.97 | 10.40 | ContractBIT | Rail |
| 2026-01EIA row 553 · preliminary | PIONEER PREPARATION PLANT1516858 | Wateree3297 · SC · B & W RESOURCES | 11,337 | 110.46 | 12,510 | 0.75 | 10.20 | ContractBIT | Rail |
| 2026-01EIA row 558 · preliminary | PIONEER PREPARATION PLANT1516858 | Williams3298 · SC · B & W RESOURCES | 22,713 | 114.27 | 12,530 | 0.81 | 10.20 | ContractBIT | Rail |
| 2025-12EIA row 34084 · final | ACES BRANCH MINE #91519441 | Cooper1384 · KY · B & W RESOURCES | 1,143 | 86.69 | 11,620 | 0.84 | 14.60 | SpotBIT | Truck |
| 2025-12EIA row 34999 · final | PIONEER PREPARATION PLANT1516858 | Cope7210 · SC · B & W RESOURCES | 50,868 | 106.26 | 12,510 | 0.89 | 10.20 | ContractBIT | Rail |
| 2025-11EIA row 32006 · final | PIONEER PREPARATION PLANT1516858 | Cope7210 · SC · B & W RESOURCES | 21,704 | 110.23 | 12,575 | 1.02 | 10.40 | ContractBIT | Rail |
| 2025-10EIA row 28131 · final | ACES BRANCH MINE #91519441 | Cooper1384 · KY · B & W RESOURCES | 2,278 | 99.84 | 12,745 | 0.94 | 11.20 | SpotBIT | Truck |
| 2025-10EIA row 29056 · final | PIONEER PREPARATION PLANT1516858 | Cope7210 · SC · B & W RESOURCES | 23,590 | 108.81 | 12,565 | 0.88 | 9.90 | SpotBIT | Rail |
| 2025-09EIA row 25059 · final | ACES BRANCH MINE #91519441 | Cooper1384 · KY · B & W RESOURCES | 5,941 | 97.04 | 12,130 | 0.75 | 12.90 | SpotBIT | Truck |
| 2025-09EIA row 25476 · final | PIONEER PREPARATION PLANT1516858 | Wateree3297 · SC · B & W RESOURCES | 12,954 | 103.49 | 12,575 | 1.01 | 10.80 | ContractBIT | Rail |
| 2025-09EIA row 25487 · final | PIONEER PREPARATION PLANT1516858 | Williams3298 · SC · B & W RESOURCES | 12,241 | 110.01 | 12,470 | 0.81 | 10.90 | SpotBIT | Rail |
| 2025-09EIA row 25993 · final | PIONEER PREPARATION PLANT1516858 | Cope7210 · SC · B & W RESOURCES | 11,533 | 109.86 | 12,535 | 0.59 | 10.40 | SpotBIT | Rail |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Big Branch #341519906 · Pike, Kentucky | 362,467 | 103.84 | 354,614 | 36,823,157 | County allocation estimate17.50% of eligible county production10 eligible mines / 10 sales respondents |
| Pioneer Preparation Plant1516858 · Knott, Kentucky | 0 | — | — | — | Preparation plant3 eligible mines / 3 sales respondents |
| Aces Branch Mine #91519441 · Leslie, Kentucky | 217,403 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
| Alum Cave #171519766 · Knott, Kentucky | 261,133 | — | — | — | County sales or price not published3 eligible mines / 3 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.