Joseph H Anderson safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Horns and backup alarms.
Tejas Quarry · 410523230 CFR 56.14132(a) · $151.00 proposed penalty
Horns and backup alarms.
Tejas Quarry · 410523230 CFR 56.14132(a) · $151.00 proposed penalty
Horns and backup alarms.
Tejas Quarry · 410523230 CFR 56.14132(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Tejas Quarry · 410523230 CFR 56.14100(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Tejas Quarry · 410523230 CFR 56.14100(b) · $151.00 proposed penalty
Controls and switches.
Tejas Quarry · 410523230 CFR 56.12002 · $151.00 proposed penalty
Safety belts and lines.
Tejas Quarry · 410523230 CFR 56.15005 · Significant and substantial (S&S) · $755.00 proposed penalty
Safe access.
Tejas Quarry · 410523230 CFR 56.11001 · Significant and substantial (S&S) · $697.00 proposed penalty
Safety defects; examination, correction and records.
Tejas Quarry · 410523230 CFR 56.14100(b) · $151.00 proposed penalty
Eye protection.
Tejas Quarry · 410523230 CFR 56.15004 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Construction and maintenance of guards.
Tejas Quarry · 410523230 CFR 56.14112(a)(1) · $226.00 proposed penalty
Controls and switches.
Tejas Quarry · 410523230 CFR 56.12002 · $151.00 proposed penalty
Housekeeping.
Tejas Quarry · 410523230 CFR 56.20003(a) · $151.00 proposed penalty
Construction and maintenance of ladders.
Tejas Quarry · 410523230 CFR 56.11003 · $151.00 proposed penalty
Construction and maintenance of guards.
Tejas Quarry · 410523230 CFR 56.14112(b) · $226.00 proposed penalty
Regular Safety and Health Inspection
Tejas Quarry · 410523232.5 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
Tejas Quarry · 41052324.8 on-site hours reported
Securing movable parts.
Tejas Quarry · 410523230 CFR 56.14206(b) · $1,037.00 proposed penalty
Horns and backup alarms.
Tejas Quarry · 410523230 CFR 56.14132(a) · $288.00 proposed penalty
Retaining dams.
Tejas Quarry · 410523230 CFR 56.20010
Retaining dams.
Tejas Quarry · 410523230 CFR 56.20010 · $1,066.00 proposed penalty
Berms or guardrails.
Tejas Quarry · 410523230 CFR 56.9300(b) · $432.00 proposed penalty
Handling of materials
A-Mining Group II LLC. · 0801134Dys awy frm wrk & restrctd act
Accident narrative
While working on classifier tank exchanging hydraulic cylinders. An employee didn't realize there was someone below and threw old cylinder over side. Striking employee on head.
Regular Safety and Health Inspection
Imperial Rock Mine · 08012483.0 on-site hours reported
Verbal Hazard Complaint Inspections
Tejas Quarry · 41052322.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.